What a North Carolina RV park site plan carries
The state rule a North Carolina RV park layout is drawn to is wastewater. The NCDHHS On-Site Water Protection Branch guidance of August 21, 2024, updated for 15A NCAC 18E, says RV parks "shall include an approved wastewater system and each space that is individually connected to a water supply source shall discharge to an approved wastewater system" [1]. The number and type of spaces set the design daily flow, and the design flow sets who may approve the system and who must design it [1]. Counties and towns decide where a park may go and how it is laid out through zoning. A North Carolina RV park layout is drawn to a wastewater tier and a local ordinance at once.
The preliminary plan is a real first draft of the park, organized on one sheet:
- the entrance, office and internal roads, every site numbered and dimensioned, and the amenity core with bathhouses and the dump station;
- the site count split the way the wastewater guidance counts it: traditional RV spaces, park models, and spaces without hookups;
- cabins drawn as their own pod, since they can bring in the lodging and building code rules below;
- riparian buffers, mapped flood areas, and steep or ridge-top land drawn first, with sites, pads and roads kept out of them;
- land held for the wastewater system, placed on the layout and sized by the engineer of record;
- a site data table with gross acreage, site count by type, the design flow tier the count falls in, parking, buffers and setbacks, and phase lines.
The engineering is not in the plan. Above 1,500 gpd a professional engineer designs the wastewater system, and above 3,000 gpd or with a dump station the state reviews it [1]. RV wastewater counts as high strength unless tested (BOD 350, TSS 100, TKN 100, FOG 30 mg/L) [1], which shapes the treatment that engineer designs. Water, electrical service, grading and drainage are by the client's engineer of record as well. This is the studio's preliminary site plan service, and the national standards behind each line of the site data table are on the RV park site plan hub.
The state layer: wastewater under 15A NCAC 18E
The 2024 guidance counts design flow per unit, with separate flows for traditional RV spaces and park models [1]. These are the unit rules the plan's site data table tracks:
| Unit | Design flow or treatment | Rule |
|---|---|---|
| Park model RV | 150 gpd per space; up to 10 spaces under local health department review | NCDHHS guidance [1] |
| RV space without hookups | Treated as a campsite where a bathhouse and a non-discharging dump station are available | NCDHHS guidance [1] |
| Cabin or other dwelling unit | 120 gpd per bedroom, 240 gpd minimum per unit | 15A NCAC 18E [4] |
| Any design unit | 100 gpd minimum | 15A NCAC 18E [4] |
The total sets the review tier:
| Design daily flow | Review |
|---|---|
| 1,500 gpd or less | The local health department may approve the system [1] |
| Above 1,500 gpd | A professional engineer is required [1] |
| Above 3,000 gpd, or any system designed to handle RV waste disposed of in a dump station | State review is required [1] |
Dump station permits come from the Division of Waste Management under 15A NCAC 13B .0832(b) [1]. Where spaces are owned separately, the guidance says an owners' association and a bi-party agreement are typically required [1]. Quoting ANSI A119.5, the guidance describes a park model RV as a unit on a single chassis with at most 400 sq ft in setup mode, or at most 320 sq ft if wider than 8.5 ft in transport [1]. Water follows its own threshold: Buncombe County's ordinance, following NCDEQ, treats 15 or more connections or 25 or more year-round residents as a public water system, and 2 to 14 connections as a county Board of Health system [5].
Seals, land disturbance and access
Who prepares and seals. G.S. 89C-25 provides that the engineering chapter "shall not prevent ... (1) The practice of architecture as defined in Chapter 83A of the General Statutes, landscape architecture as defined in Chapter 89A of the General Statutes, or contracting" [6]. Gaston County's UDO Section 5.2.1(A) encourages, but does not require, a site plan prepared by a North Carolina engineer, architect, landscape architect or land surveyor, and site plan review applies to all uses other than single or two family dwellings [7]. The wastewater design above 1,500 gpd is a PE's work [1], and NCDOT Division 10's driveway package of October 14, 2025 requires traffic impact analyses and drainage studies to be sealed by a North Carolina licensed professional [8]. The preliminary plan is what those sealed documents are built on.
Land disturbance. An RV park that disturbs one acre or more, or is part of a common plan of development of that size, falls under construction stormwater permit NCG010000 [9]. A DEQ report states that the erosion and sedimentation control plan goes in at least 30 days before land disturbance on any site over one acre, that the statute requires a decision within 30 days for a new plan and 15 days for a revised one, and that NCG01 coverage is typically issued within 3-5 days after a complete notice of intent [10].
Driveways and traffic. NCDOT charges no fee for a driveway permit and uses 3,000 vehicles per day as the threshold that normally requires a Traffic Impact Study [11]. Towns can set a lower line: in Hendersonville, an NCDOT review found a project under the 3,000 daily trip threshold but over the city's 1,000 daily trips or 100 residential unit threshold, and required a westbound left-turn lane with 50 ft of storage [12].
Parking. From January 1, 2027, S.L. 2026-39 bars a local government from requiring a minimum number of parking spaces for a development, except in the coastal area defined in G.S. 113A-103, and it caps a required stall at 9 feet wide by 20 feet long [13].
Zoning protections. Under S.L. 2024-57, a local government may not down-zone land, which includes reducing permitted uses or creating a nonconformity on land outside a residential district, without the written consent of all affected owners, and the UNC School of Government reported in February 2026 that the bar was still in place [14]. Since October 6, 2025, S.L. 2025-94 bars waiting periods before refiling a denied or withdrawn rezoning [14]. S.L. 2025-12, effective October 1, 2025, adds a 45-day advisory board review and a 120-day wait before land in a voluntary agricultural district is rezoned [15], which matters for rural RV park sites on farmland.
Farms and membership campgrounds. Agritourism escapes zoning in North Carolina only on bona fide farm property under G.S. 160D-903(a), and the courts look for a "natural" rural activity (Hampton v. Cumberland County) [16, 17]. A membership campground is also subject to the Membership Camping Act, G.S. Chapter 66, Article 31, administered by the Secretary of State [18].
The coast and the mountains
Coast. DEQ's Division of Coastal Management states: "Major permits are necessary for activities that require other state or federal permits, for projects that cover more than 20 acres or for construction covering more than 60,000 square feet. Applications for major permits are reviewed by 10 state and four federal agencies" [19]. The parking minimum ban does not reach local governments in the coastal area, which keep their parking rules after January 1, 2027 [13]. A coastal RV park on a large tract should be laid out with the CAMA threshold in view, since the acreage alone can trigger the major permit [19].
Mountains. Under G.S. 113A-206(6), "Protected mountain ridges" are ridges "whose elevation is 3,000 feet and whose elevation is 500 or more feet above the elevation of an adjacent valley floor"; "Tall buildings or structures" are those over 40 feet, and nothing may "protrude at its uppermost point above the crest of the ridge by more than 35 feet" [3]. Counties carry the act out by ordinance: Haywood County's Chapter 153, revised September 5, 2023, requires a permit and commissioner approval [20].
Helene counties. S.L. 2025-97 suspends the running of development approvals in Helene-affected areas that qualify for FEMA Public Assistance Categories C to G, for approvals "current and valid at any point during the period beginning January 1, 2024, and ending December 31, 2027" [14]. Approvals valid on September 25, 2024 get "an extra twelve months of validity," and the extension covers plats, special use permits, erosion control plans and water and wastewater permits, but not federal permits [14]. A local government may revoke or modify an extended approval where changed site conditions mean the site no longer meets state or federal safety, environmental or engineering standards, with written findings [14]. A western RV park site with an older approval is surveyed again before the plan is redrawn.
Cabins, park models, tents and the building code
Cabins change the rules that apply. If Environmental Health classifies them as a lodging establishment, 15A NCAC 18A .1825(d) requires that "Baths, handwashing sinks, and toilets shall be provided for each guest room or unit" in establishments built on or after December 1, 1988 [21]. That classification decides whether cabins share the bathhouse or each carries its own bath.
North Carolina's 2018 building code amendments exempt camping units in a campground from sprinklers if they are one story, under 400 sq ft and without a kitchen [22]. A park model that stays a vehicle is not a building, but the State Fire Marshal's guidance says a building in place 180 days or more must comply with the full code [23]. Counties add their own line: in Buncombe County the travel trailer definition now takes in movable park model homes [24], and travel trailers are limited to 180 days of use per calendar year (Sec. 78-664) [5].
Tents follow the fire code. The NC Fire Prevention Code, based on IFC 2015 Chapter 31, requires a permit from the fire code official before a tent or membrane structure goes up, limits a temporary tent to 180 consecutive days within a 12-month period on one premises, and sends permanent tents, and membrane structures on decks, to the building code (IBC Section 3102) [25]. A campground that adds platform tents to an RV park plans for them as permanent structures if they stand all season [25].
County and town rules: Buncombe, Fairmont and Banner Elk
Buncombe County's Chapter 78 shows how a mountain county routes an RV or campground program. No "glamping" or "campground" use appears in its 2018 permitted use table. A wheeled program goes through the travel trailer park use, listed as a conditional use in R-3 and a use with special requirements in PS, CR and OU; a program with more than 4 principal buildings on a lot needs a planned unit development (Sec. 78-662) [5]. Either way the decision is a Special Use Permit from the Board of Adjustment, sitting as a quasi-judicial body, with the application filed at least 30 days before the hearing [5]. OU, the least restrictive district, still requires that permit for conditional or special uses [5].
The provisions that bind a travel trailer layout:
- Occupancy. Travel trailers and recreational vehicles "may be used as a temporary single-family dwelling for no more than 180 days out of the calendar year only in those districts that permit travel trailers or travel trailer parks," and "In no case shall a travel trailer or recreational vehicle be permanently set up or affixed to the ground or site" (Sec. 78-664) [5].
- Ridges. The Protected Ridge overlay does not list travel trailer parks among its allowed uses (Sec. 78-645) [5].
- Floodway. Amendment ZPH2026-00002, adopted April 21, 2026, bars temporary non-residential structures such as travel trailers, RVs and sheds from the floodway [26], requires an Emergency Action Plan for all temporary structures in the floodplain, and holds fill-based map revisions to 2 ft above base flood elevation [27].
- Access. Entrances on state-maintained roads must be approved by NCDOT "prior to receiving a zoning permit" (Sec. 78-661), and Sec. 78-677(d)(5) requires documentation from the Fire Marshal "of the adequacy of the development's facilities for emergency medical and fire services" [5]. The 2021 Windy Wood Bike Park camping application proposed 16 ft roads, a 74 ft diameter cul-de-sac and a 40 ft T turnaround [28].
The concept stage takes an unsealed plan. The pre-application conference takes a "sketch development plan," and Sec. 78-677(d) asks for a development plan "drawn to scale, with the date of preparation" [5]. To support vested rights a plan has to describe "with reasonable certainty the type and intensity of use" (Sec. 78-581) [5], and the preliminary plan fixes unit counts, types and locations for that reason. ZPH2023-00036, noticed for the Board of Adjustment's January 10, 2024 meeting, sought a PUD Level 1 permit to add 6 travel trailer sites, a bathhouse and a dump station to an existing vacation rental complex in Weaverville [29]. The Buncombe County glamping resort model project carries the PUD route, the mountain overlays, the fees and the hearing record in depth.
Town ordinances write campground layout rules directly. Fairmont's Sec. 154.243, which covers public and private campgrounds including recreational vehicle parks and travel trailer parks, requires service buildings, internal-only site access and NCDOT approval of entrances [30]. Banner Elk's commercial campground section, 152.207, requires 5 acres, a 30% use and 70% open space split, campsites of at least 3,000 sq ft, and a perimeter setback of 35 ft from the property line in a residential zone and 200 ft from a non-associated residence [31].
The Neuse and Jordan buffers and the Triangle
In the Neuse River Basin, which takes in Raleigh, Wake and Johnston counties and parts of Durham, 15A NCAC 02B .0714 protects a 50-foot riparian buffer along intermittent and perennial streams, lakes, ponds, reservoirs and estuaries, excluding wetlands [2]. Zone 1 runs 30 ft from the water and stays essentially undisturbed; Zone 2 runs a further 20 ft, where grading and revegetation are allowed if Zone 1 is not compromised [2]. Uses present as of July 22, 1997 are exempt, and the rule's use table sorts crossings by zone and width, with a separate line for built-upon area no more than 10 feet wide with two foot wide shoulders [2]. The Jordan rule, 15A NCAC 02B .0267, also sets 50 feet, with Zone One the inner 30 ft and Zone Two the outer 20 ft [32]. Wake County enforces the Neuse buffer rules in both the Cape Fear and Neuse basins, except where the Jordan rules supersede [33].
Mitigation is charged at a multiple of the area. Jordan buffer impacts are mitigated at 3:1 for Zone 1 and 1.5:1 for Zone 2 under 15A NCAC 02B .0295 [34], and Johnston County's Sec. 14-393 multiplies Zone 1 impacts by three and Zone 2 impacts by one and one-half [35]. For an RV park the buffer is drawn before the first site: pads, roads and amenities stay out of Zone 1, road crossings are kept to the fewest and narrowest the use table allows, and any grading in Zone 2 is the engineer of record's to design.
Charlotte and Raleigh-Durham: metro site review
In Charlotte, a use that cannot be interpreted as part of a listed use is prohibited (UDO 15.1.C), and a "C" use requires conditional zoning under Sec. 37.2 [36]. Commercial site plans then go to Land Development "after land entitlement (approved rezoning, site plan amendments, etc.)," for projects in the city and its extraterritorial jurisdiction [37]. "The review cycle is 15 business days," with an internal goal of "commercial plan approval in 2.5 review cycles on average" [38]. The entitlement drawing and the construction site plan are separate submittals: the preliminary plan serves the first and becomes the base for the second.
In Raleigh, UDO Sec. 10.2.8 sorts site plans into Tier One, Two and Three, and "ASR review and approval is only required for Tier Two and Tier Three site plans" [39]. A new use on vacant land is generally Tier Three, and an approval lasts 3 years unless a building permit is issued or vested rights apply [40]. Site Permit Review applies to "land disturbance of 12,000 square feet or greater," and an approved Administrative Site Review carries a site data table and a lighting plan under UDO Sec. 7.4 [41]. Owners and tenants within 100 feet are notified for qualifying reviews [42].
The metro pages for Charlotte and Raleigh-Durham set out each city's process. For a Triangle town's site plan path on another asset, see the self storage model project in Apex and the North Carolina self storage site plan page.
North Carolina model projects and related plans
The glamping resort in Buncombe County is a model project: a 20 to 40 unit resort traced through the county's PUD Special Use Permit, its steep slope and ridge overlays, the 2026 flood amendment and the state health and building rules, used to show how those rules shape a site plan. Its travel trailer and wastewater findings carry over to RV and campground programs in the mountains. The North Carolina site plan page carries the statewide approval layers.
Related plans: glamping site plans in North Carolina, campground site plans, RV resort site plans, RV sites per acre and RV park rendering. RV park plans in other states: Texas RV parks, Arizona RV parks, Tennessee RV parks, Georgia RV parks and Florida RV parks. The studio's note on Charlotte development and North Carolina site plans covers the market side. To start a North Carolina layout, send the parcel and the program.
Frequently asked questions
Who approves an RV park's wastewater system in North Carolina?
The local health department may approve a system whose design daily flow is 1,500 gpd or less. Above 1,500 gpd a professional engineer must design it, and the state reviews any system above 3,000 gpd or any system designed to handle RV waste disposed of in a dump station [1].
What design flow does a park model RV carry in North Carolina?
Can park models serve as cabins in a North Carolina RV park?
Does a coastal RV park need a CAMA major permit?
DEQ says major permits are needed for projects covering more than 20 acres, for construction covering more than 60,000 square feet, and for activities that need other state or federal permits; 10 state and four federal agencies review the application [19].
Does the Mountain Ridge Protection Act limit RV park buildings?
On a protected ridge, one at 3,000 feet or more and 500 feet or more above the adjacent valley floor, a building over 40 feet is a tall structure and nothing may rise more than 35 feet above the crest. Counties carry this out by ordinance; Haywood County's Chapter 153 requires a permit and commissioner approval [3, 20].
How wide is the Neuse riparian buffer?
50 feet on all sides of the surface water: 30 ft in Zone 1 and 20 ft in Zone 2, under 15A NCAC 02B .0714. Uses present as of July 22, 1997 are exempt [2].
Can RVs be placed in the floodway in Buncombe County?
Sources
- 1)RV Parks design guidance, On-Site Water Protection Branch (August 21, 2024), North Carolina Department of Health and Human Services. Accessed 2026-10-10.
- 2)15A NCAC 02B .0714, Neuse River Basin: Protection and Maintenance of Existing Riparian Buffers (rule text), North Carolina Office of Administrative Hearings. Accessed 2026-10-10.
- 3)G.S. 113A-206, Mountain Ridge Protection: Definitions, North Carolina General Assembly. Accessed 2026-10-10.
- 4)15A NCAC Subchapter 18E (rule text), North Carolina Department of Health and Human Services. Accessed 2026-10-09.
- 5)Buncombe County Zoning Ordinance, Chapter 78 (compiled, as amended May 1, 2018), Buncombe County, North Carolina. Accessed 2026-10-09.
- 6)G.S. 89C-25, Limitations on application of Chapter, North Carolina General Assembly. Accessed 2026-10-10.
- 7)Gaston County Unified Development Ordinance, Chapter 5, Permit Approval, Gaston County, North Carolina. Accessed 2026-10-10.
- 8)NCDOT Division 10 driveway permit application package (October 14, 2025), North Carolina Department of Transportation (posted by the City of Charlotte). Accessed 2026-10-10.
- 9)NPDES General Permit NCG010000, construction stormwater, North Carolina Department of Environmental Quality. Accessed 2026-10-10.
- 10)Report to the General Assembly: study of erosion and sedimentation applicable to stormwater discharges from construction activities, North Carolina Department of Environmental Quality. Accessed 2026-10-10.
- 11)Driveway Permit Frequently Asked Questions, North Carolina Department of Transportation. Accessed 2026-10-10.
- 12)NCDOT traffic review letter, LEO Cottages at Haywood Road (Hendersonville), North Carolina Department of Transportation (City of Hendersonville meeting record). Accessed 2026-10-10.
- 13)Session Law 2026-39 (House Bill 162), North Carolina General Assembly. Accessed 2026-10-10.
- 14)Planning and Zoning Law Bulletin No. 36 (February 2026), UNC School of Government. Accessed 2026-10-10.
- 15)Session Law 2025-12 (House Bill 126), North Carolina General Assembly.
- 16)What the heck is agritourism? Defining a non-farming agricultural use, UNC School of Government, Coates' Canons. Accessed 2026-10-10.
- 17)Agricultural Uses and Zoning (legal summary), UNC School of Government. Accessed 2026-10-10.
- 18)General Statutes Chapter 66, Article 31, Membership Camping, North Carolina General Assembly. Accessed 2026-10-10.
- 19)CAMA Major Permit Applications, North Carolina Department of Environmental Quality, Division of Coastal Management. Accessed 2026-10-10.
- 20)Chapter 153, Mountain Ridge Protection (revised September 5, 2023), Haywood County, North Carolina. Accessed 2026-10-10.
- 21)15A NCAC 18A .1800, Lodging Establishments, North Carolina Department of Health and Human Services. Accessed 2026-10-09.
- 22)2018 North Carolina State Building Code amendments (September 13, 2022), North Carolina Office of State Fire Marshal. Accessed 2026-10-09.
- 23)Guidance paper, city and county owned temporary sleeping units, North Carolina Office of State Fire Marshal. Accessed 2026-10-09.
- 24)Buncombe County Code of Ordinances, Chapter 78, Sec. 78-678 (current text), Buncombe County, North Carolina (via Municode). Accessed 2026-10-09.
- 25)North Carolina Fire Prevention Code 2018, Chapter 31, Tents and Other Membrane Structures (North Carolina Building Code Council, via UpCodes), North Carolina Building Code Council (via UpCodes). Accessed 2026-10-10.
- 26)Buncombe Commissioners approve unified fire tax, flood prevention ordinance, Biltmore Beacon. Accessed 2026-10-09.
- 27)Board of Commissioners Recap April 21, Buncombe County, North Carolina. Accessed 2026-10-09.
- 28)Windy Wood Bike Park special use permit application (June 9, 2021), Buncombe County Planning and Development. Accessed 2026-10-09.
- 29)Board of Adjustment notice, January 10, 2024 (ZPH2023-00036, Deerborne Cottages), Buncombe County Planning and Development. Accessed 2026-10-09.
- 30)Sec. 154.243, Camp grounds, public and private, including recreational vehicle parks and travel trailer parks, Town of Fairmont, North Carolina (via American Legal Publishing). Accessed 2026-10-10.
- 31)Sec. 152.207, Commercial campgrounds, Town of Banner Elk, North Carolina (via American Legal Publishing). Accessed 2026-10-10.
- 32)15A NCAC 02B .0267, Jordan Water Supply Nutrient Strategy: Protection of Existing Riparian Buffers (rule text), North Carolina Office of Administrative Hearings. Accessed 2026-10-10.
- 33)Wake County Environmental Services Department, watershed management approval letter, Wake County, North Carolina (posted by the Town of Rolesville). Accessed 2026-10-10.
- 34)15A NCAC 02B .0295, Mitigation Program Requirements for Protection and Maintenance of Riparian Buffers (rule text), North Carolina Office of Administrative Hearings. Accessed 2026-10-10.
- 35)Sec. 14-393, Riparian buffer protection (for lands within the Neuse River Basin), Johnston County, North Carolina (via American Legal Publishing). Accessed 2026-10-09.
- 36)Charlotte Unified Development Ordinance, Article 15, Use Regulations, City of Charlotte. Accessed 2026-10-10.
- 37)Commercial Plan Review Process, City of Charlotte. Accessed 2026-10-09.
- 38)Detailed Plan Review, City of Charlotte. Accessed 2026-10-09.
- 39)Administrative Site Review, City of Raleigh. Accessed 2026-10-09.
- 40)Raleigh Unified Development Ordinance, Sec. 10.2.8, Site Plan Review, City of Raleigh, North Carolina. Accessed 2026-10-10.
- 41)Administrative Approval Action, ASR-0047-2023, City of Raleigh. Accessed 2026-10-09.
- 42)Administrative Site Review Submittal Instructions, City of Raleigh. Accessed 2026-10-09.