A boat storage site is drawn to a different rulebook depending on whether it launches boats. This page sets out the dry stack and open boat yard rules that shape the layout, with Lee County, Florida as the worked model and the Lake Conroe market in Texas beside it.

Last reviewed

Dry stack racks in Lee County
Each rack counts as a slip under LDC 26-41 [1]
Dry storage parking, Lee County
1 space per 5 unit stalls, LDC Table 34-2020(b) [2]
Open boat yard screen, Lee County
8 ft where visible from residential; 6 ft where visible from a street (LDC 34-3005) [3]
Dry stack height
Set in the planned development under LDC 34-2174 and 34-2175 [4]
Concept stage
The pre-application meeting accepts a conceptual plan [5]

What a boat storage site plan carries

Boat storage takes three site forms, and the plan has to say which one it draws, because each answers to a different rulebook:

  • Dry stack. Boats racked in or beside a tall storage building and moved by forklift or gantry across an apron to the water. In Lee County, Florida, a facility that offers dry boat storage "with a service to place boats in the water" is a marina under the county's own definition [6].
  • Open boat yard. Trailered boats parked on a surfaced lot behind a screen, with no launch service; Lee County's code treats that as commercial outdoor storage behind a continuous visual screen [3].
  • Covered and enclosed stalls. Canopy rows and enclosed units, usually shared with RVs. Their stall, aisle and canopy benchmarks are on the RV and boat storage page and are not repeated here.

A preliminary site plan for a boat program carries rows a general storage sheet does not:

  • The rack count and the largest boat the racks and forklift lane are drawn for. A North Fort Myers marina was reported by WINK News as able to "store up to 239 boats up to 50 feet in length" [7], and a Fort Myers Beach rebuild went from 441 to 434 boats in 68,000 sq ft to take larger boats and a wider center lane for forklifts, as the Fort Myers Beach Observer reported [8].
  • A slip tabulation that counts racks, wet slips and boat ramp parking spaces together wherever a manatee protection plan applies [1].
  • Parking against the dry storage ratio, 1 space per 5 unit stalls in Lee County [2].
  • The building height the planned development will be asked to set, and the airport review a tall building triggers [4, 5].
  • The flood elevation of the dry stack slab, the apron and the store, set at base flood elevation plus 1 ft of freeboard in Lee County [9].
  • The screen height on every edge of an open yard [3].

When boat storage becomes a marina

The launch decides the rulebook. Lee County defines a marina as a facility "which provides a boat ramp with parking for vehicles and trailers, boat slips, dockage, or dry boat storage with a service to place boats in the water" [6]. A dry stack that launches boats is therefore a marina, and so is a yard with a ramp; a yard with neither a ramp nor a launch service sits outside that definition [6].

Once the site is a marina, every rack is counted. LDC 26-41 defines a slip as a space for mooring or storing one watercraft of any size, and its list takes in wet and dry slips, hoists, boats parked on trailers, open or covered racks and the parking spaces for boat ramps [1]. Slip counts must comply with the Manatee Protection Plan under LDC 26-71(a)(4), and a permit that changes a facility's configuration in a way the plan does not allow is prohibited under LDC 26-45(i) [1]. The county's plan is dated June 17, 2004, was approved June 29, 2004 and was incorporated into the Lee Plan on May 16, 2007 through CPA 2005-41 [10]. Where slips move between sites, Administrative Code 13-21 rounds the maximum number built on site up to the nearest whole number and the maximum transferred down [11]. Lee County Natural Resources makes the slip determination, through a GIS evaluation, before zoning [12].

For a boat storage developer, that turns the rack count into a regulated number [1, 12].

The open yard answers to the screen instead. Lee County requires commercial or industrial outdoor storage to sit behind a continuous visual screen at least 8 ft high where it is visible from a residential use or residential zoning district, and 6 ft high where it is visible from a street right-of-way or street easement (LDC 34-3005) [3].

Inland lake markets add the lake owner. On Lake Conroe in Texas, the San Jacinto River Authority licenses "commercial operations (marinas, boat/personal watercraft rentals, construction, and any other businesses on the reservoir)" [13]. The land side of that market is set out on the Texas RV and boat storage page and in the Montgomery County model project, and the Houston metro page covers the region.

Dry stack standards (Lee County model)

These are Lee County rules, not Florida-wide law. The full marina program, wet slips included, is on the marina site plans page and in the Lee County dry stack model project.

ElementRuleCodeSource
RacksEach rack counts as a slipLDC 26-41[1]
Building heightSet in the commercial planned developmentLDC 34-2174, 34-2175 (Ord. 23-22)[4]
Height measurementMeasured under the county's height definitionLDC 34-2171[14]
Airport obstruction zonesTall Structures Permit from the Lee County Port AuthorityLDC 10-154(13)[5]
Dry storage parking1 space per 5 unit stallsLDC Table 34-2020(b)[2]
Boat ramp parking10 spaces per boat rampLDC Table 34-2020(b)[2]
Parking reductionUp to 10% administrativelyLDC 34-2020[2]
Boat ramp side setback10 ftLDC 26-71(d)(5)[1]
Launch and basin depth1 ft of clearance below the deepest draft, and at least 4 ft at mean low water in mooring areas, turning basins and the paths in and outLDC 26-71(f)(2)[1]
Open storage screen8 ft where visible from residential; 6 ft where visible from a streetLDC 34-3005[3]
FloodBase flood elevation plus 1 ft of freeboard; full compliance once improvement cost equals or exceeds 50% of the structure's market valueLee County flood rules[9]
FireA fire protection plan with NFPA 303 review by the local fire district; NFPA 303, 2021 edition, adopted through the Florida Fire Prevention Code, 8th EditionLDC 10-154(20); 69A-3.012[5, 15]
Fuel tanksAboveground storage tanks over 550 gallons fall under Rule 62-76262-762.301, F.A.C.[16]
Hurricane planAn Emergency Preparedness Plan for marinas and multi-slip docks before the Development OrderLDC 10-154(21)[5]

The parking rows and the screen row were read through a secondary code host, so the plan carries them as the county's numbers to confirm against the adopted code at pre-application [2, 3]. The depth rule reaches the water side of a dry stack marina, because it applies within mooring areas, turning basins and the ingress and egress pathways [1].

Diagram of an open boat yard with a screen toward a residential neighbour and toward the street, plus a parking note
Illustrative diagram, not to scale: an open boat yard with its screens and parking ratio, using the Lee County figures this page cites from the sources listed below.

Approval path, and where the concept plan goes

Large projects in Lee County need planned development zoning as "Developments of County Impact" [17]. The steps for a dry stack marina, and what the plan does at each:

StepBodyWhat the plan doesSeal status
Pre-application meetingLee County Community DevelopmentA conceptual plan is accepted [5]Not sealed [5]
Manatee slip determinationLee County Natural ResourcesThe slip tabulation, racks counted [12]County analysis
CPD rezoning or amendmentHearing Examiner recommends; Board of County Commissioners decides [18]Master concept plan; for dock departures, a dimensioned plan view, scaled architectural elevations above mean high water and a benthic survey (LDC 34-202(b)(5)d.4) [1]Not stated
Development OrderDevelopment ServicesSite plan with buildings, travel ways, parking and cross sections [5]; fee $3,000 plus $60 per acre, amendment $775, resubmittal $435 with the first free [19]All plans signed and sealed (LDC 10-102) [5]
Dock and shoreline permitCommunity DevelopmentLaunch and dock workConstruction drawings sealed by a professional engineer or registered architect may be required (LDC 26-45(c)) [1]
State and federal permitsFDEP and USACEWhere a state submerged lands lease is required, county approval comes first (LDC 26-45(b)(7)) [1]Not stated
Close-outLee CountyAs-built surveySealed by a Florida surveyor (LDC 26-45(d)(3)) [1]

The county reports that "The average time to complete a planned development rezoning is 9 months, depending on completeness of the application when submitted" [17]. Florida's statutory clocks then govern development permits and orders: under F.S. 166.033 for cities and 125.022 for counties, completeness review takes 30 days, a decision follows 120 days after a complete application without a hearing or 180 days with one, and missed deadlines refund 10% to 100% of the fee [20]. Planned development phasing carries a clock of its own, because Lee County deems the unbuilt balance vacated if a phase "was not commenced within one year of its programmed date" [21].

Size triggers add work to the schedule. Lee County requires a protected species survey for all planned development rezonings and for developments over 10 acres or with more than 2 acres of impervious area, and a stormwater pollution prevention plan at 1 acre or more of disturbance (LDC 14-477) [5]. The guide to where unsealed site plans are accepted sets the Lee County concept stage beside other jurisdictions, and preliminary versus final site plans walks the handoff.

What the record shows

The dry stack records that can be cited are local news reports, a county property page and state filings:

  • Port Phoenix Waterway Marina, Inlet Drive, North Fort Myers. WINK News reported on Nov. 1, 2022 that the marina "can store up to 239 boats up to 50 feet in length" [7]; the Cape Coral Breeze reported on Nov. 8, 2021 that the original county proposal was "dry storage for 200 boats" [22]. The county's Waterway Estates Marina page states that "approximately $9,000,000 in Capital Improvements are planned and funded by the lessee" [23], and the North Fort Myers Neighbor reported on July 19, 2022 a 30-year lease term with two 10-year extension options [24].
  • Loggerhead Fish-Tale Marina, Fort Myers Beach. The Fort Myers Beach Observer reported that the Town Council approved the rebuild on August 18, 2025, reconfiguring dry storage for larger boats from 441 to 434 boats in 68,000 sq ft, with a wider center lane for forklifts, and with temporary fueling stations running during the dock buildout [8].
  • Montgomery County, Texas. State accessibility registrations in the Lake Conroe county name boat storage: Milstead Storage Buildings 1 and 2 at 700 McCaleb Rd, Montgomery, a lease office and warehouse plus boat and RV storage of 54,000 sf at an owner-reported estimate of $3.4M, registered May 25, 2022 [25]; and Pine Lane Boat and RV Storage at 9019 Pine Lane, Magnolia, with paving, storm drainage, detention and fire protection over 51,575 sf at an owner-reported estimate of $750,000, registered Feb 5, 2020 [26]. These are TDLR accessibility registrations, not land use approvals [25, 26].
  • Rents. A secondary Miami source puts dry stack storage for a 30 ft boat at $950 to $1,350 per month in 2026 [27].

The Florida statewide layer for waterfront projects is on marina site plans in Florida and the Florida state page, with the Miami metro page for the local layer in the southeast of the state.

What the engineer of record adds

The preliminary plan fixes the rack count, the slip tabulation, the building envelope, the apron, launch, parking and screen, and the site data table that a pre-application meeting and a planned development hearing are run on. The Development Order set is the engineer's and the surveyor's. Lee County's guide lists what it holds: a legal description and sealed sketch, title and a boundary survey; the site plan with buildings, travel ways, parking and cross sections; a traffic impact statement; a FLUCCS map and the protected species survey and plan; utility and drainage plans; a landscape plan; an exterior lighting and photometric plan; the Tall Structures Permit; a fire protection plan; the Emergency Preparedness Plan required for marinas and multi-slip docks; commercial architectural elevations; the stormwater pollution prevention plan; and the state and federal permit applications, from the USACE and the Environmental Resource Permit to FDEP fuel tanks, FDOT and FDOH [5]. Dock work drawings carry a professional engineer's or registered architect's seal, and the as-built survey a surveyor's [1]. Aboveground fuel tanks over 550 gallons fall under Rule 62-762, and their design is the engineer's [16]. Where a jurisdiction requires a sealed site plan, the preliminary plan is the base the engineer of record builds that set on.

Related storage and waterfront pages: self storage site plans, industrial outdoor storage site plans for trailer and equipment yards, and the blog pieces on marina permitting and site planning for RV and boat storage in Texas.

Frequently asked questions

Do dry stack racks count as boat slips?

In Lee County, Florida, yes. LDC 26-41 counts open or covered racks, boats parked on trailers and the parking spaces for boat ramps as slips, so the whole dry stack sits inside the Manatee Protection Plan count [1].

How much parking does dry boat storage need?

Lee County's parking table sets 1 space per 5 dry storage unit stalls and 10 spaces per boat ramp, and the Director may reduce required parking by up to 10% administratively [2].

How tall can a dry stack building be?

In Lee County the height is set in the commercial planned development under LDC 34-2174 and 34-2175 [4], and a Tall Structures Permit from the Lee County Port Authority applies where airport obstruction zones reach the site [5].

Is a boat yard with a launch service a marina?

In Lee County it is. The county's definition of a marina includes dry boat storage with a service to place boats in the water, as well as a boat ramp with parking for vehicles and trailers [6].

Can a boat storage concept plan go to Lee County unsealed?

At the pre-application meeting, yes: the county accepts a conceptual plan [5]. The Development Order set is different, because all of its plans are signed and sealed under LDC 10-102 [5].

What screen does an open boat yard need in Lee County?

Commercial or industrial outdoor storage sits behind a continuous visual screen at least 8 ft high where it is visible from a residential use or district, and at least 6 ft high where it is visible from a street (LDC 34-3005) [3].

What does dry stack storage rent for?

One secondary Miami source puts dry stack storage for a 30 ft boat at $950 to $1,350 per month in 2026 [27].

Sources

  1. 1)Lee County Ordinance No. 22-24, amending the Land Development Code (Chapters 26 and 34), Lee County, Florida. Accessed 2026-10-10.
  2. 2)Land Development Code Sec. 34-2020, Required parking spaces (Lee County text, read through a secondary code host), Lee County, Florida (via elaws). Accessed 2026-10-10.
  3. 3)Land Development Code Sec. 34-3005, Storage facilities (Lee County text, read through a secondary code host), Lee County, Florida (via elaws). Accessed 2026-10-10.
  4. 4)Lee County Ordinance No. 23-22 (height, LDC 34-2174 and 34-2175), Lee County, Florida. Accessed 2026-10-10.
  5. 5)Development Order: Application and Approval Guide, Lee County Department of Community Development. Accessed 2026-10-10.
  6. 6)The Lee County Land Development Code, Ordinance No. 94-24, Lee County, Florida. Accessed 2026-10-09.
  7. 7)Port Phoenix marina dry storage report, Nov. 1, 2022, WINK News.
  8. 8)Loggerhead Fish-Tale Marina gets approvals for rehabilitation work, Fort Myers Beach Observer. Accessed 2026-10-10.
  9. 9)Substantial Improvement/Substantial Damage, Lee County Department of Community Development. Accessed 2026-10-10.
  10. 10)Lee County Ordinance No. 09-23 (Manatee Protection Plan in the Land Development Code), Lee County, Florida. Accessed 2026-10-10.
  11. 11)Administrative Code AC-13-21 (transfer of slip credits), Lee County Board of County Commissioners. Accessed 2026-10-10.
  12. 12)Manatee Protection Plan, Lee County Natural Resources. Accessed 2026-10-10.
  13. 13)Licensing and Permitting, Lake Conroe, San Jacinto River Authority. Accessed 2026-10-09.
  14. 14)Chapter 34, Zoning (Lee County Land Development Code, height measurement), Lee County, Florida (via Municode). Accessed 2026-10-09.
  15. 15)Florida Fire Prevention Code, Florida Division of State Fire Marshal. Accessed 2026-10-10.
  16. 16)Fla. Admin. Code R. 62-762.301, Applicability (aboveground storage tank systems), Florida Department of Environmental Protection rule read through a secondary mirror, Florida Department of Environmental Protection (via Cornell LII). Accessed 2026-10-09.
  17. 17)Planned Development, Lee County Department of Community Development. Accessed 2026-10-09.
  18. 18)Hearing Examiner, Lee County, Florida. Accessed 2026-10-10.
  19. 19)External Fees and Charges Manual (May 2026), Lee County Board of County Commissioners. Accessed 2026-10-10.
  20. 20)Chapter 166 Section 033, 2025 Florida Statutes, The Florida Senate. Accessed 2026-10-10.
  21. 21)Lee County Ordinance No. 01-03 (planned development phasing), Lee County, Florida. Accessed 2026-10-09.
  22. 22)Port Phoenix dry storage proposal report, Nov. 8, 2021, Cape Coral Breeze.
  23. 23)Waterway Estates Marina, Lee County, Florida. Accessed 2026-10-09.
  24. 24)Port Phoenix lease report, July 19, 2022, North Fort Myers Neighbor.
  25. 25)TDLR TABS2022019994, Milstead Storage Buildings 1 and 2, Texas Department of Licensing and Regulation. Accessed 2026-10-10.
  26. 26)TDLR TABS2020010782, Pine Lane Boat and RV Storage, Texas Department of Licensing and Regulation. Accessed 2026-10-10.
  27. 27)Slip vs Dry Stack vs Trailer: Miami Boat Storage Costs, Boat Repair Miami. Accessed 2026-10-10.