Site plans / States / Rhode Island

Site plans in Rhode Island

Rhode Island has no county layer, one municipal board now decides the plan and its zoning relief together, and within 200 feet of the coast a second regulator, CRMC, holds its own assent. This page sets out each layer, the clocks that bind it and the rule behind every number.

Last reviewed

Unified Development Review
Mandatory since January 1, 2024 (RIGL 45-24-46.4) [1]
CRMC coastal reach
200 ft inland of any coastal feature, out to 3 miles offshore [2]
Freshwater wetland buffer zones
25 to 200 ft from the wetland edge (250-RICR-150-15-3) [3]
Construction stormwater permit
RIPDES Construction General Permit at 1 acre or more of disturbance [4]
RIDOT Traffic Impact Study
100 or more new vehicle trips per hour during peak traffic (290-RICR-20-00-14) [5]

The Rhode Island thesis: five conditions that shape the plan

Rhode Island's site plan rules do not resemble those of its neighbors. Five conditions decide how a plan is drawn and who decides it.

1. There is no county layer. The five counties (Providence, Kent, Washington, Bristol and Newport) are geographic designations with no land use, permitting or planning function. Every approval runs through a city or town, or through a state agency acting directly on the project. The two tracks are independent. A municipal approval does not cure a missing state permit, and the municipal clock on a major preliminary plan is extended automatically if evidence of required state permits has not been provided [6]. A developer used to a county planning department should staff a Rhode Island job as one municipal review plus direct state files at CRMC, RIDEM and RIDOT.

2. One board decides the plan and its zoning relief. Since January 1, 2024, every municipal zoning ordinance must provide for Unified Development Review (UDR): variances and special-use permits for a project that qualifies are "conducted and decided by the authorized permitting authority" in the same proceeding as the development application [1]. In practice the planning board, not the zoning board, now hears the relief your layout needs. The 2023 package, led by House Bill H6061, made UDR mandatory where it had been optional and sent permitting appeals directly to Superior Court [7]. Not every municipality conformed at the same pace, and some posted materials still describe the pre-reform zoning board process [8]. Block Island (New Shoreham) was still amending its ordinances into late 2024, and its land use attorney's summary of the changes ran 18 pages [9]. The drawing consequence: the site data table should state each dimensional relief sought, because one hearing now decides the layout and the relief together.

3. Statutory clocks end in deemed approval. Certification of completeness must occur within 25 days, or 15 days where there is no street creation or extension and no UDR [10]. A major preliminary plan is decided within 90 days of certification of completeness [6], and a major final plan within 45 days [11]. If the planning board or administrative officer fails to act within the prescribed period, the plan is approved, and the administrative officer issues a certificate to that effect on request [6, 11, 12]. The clock starts at certification, not at filing, which makes a complete first submission the fastest route to a decision.

4. The coast is a second jurisdiction. The Coastal Resources Management Council (CRMC) holds authority "from the territorial sea limit (three miles offshore), to two hundred (200) feet inland from any coastal feature, to watersheds, and to certain activities that occur anywhere within the state" [2]. Coastal features include beaches, dunes, barrier islands, coastal wetlands, cliffs, bluffs and banks, rocky shores and manmade shorelines, and each carries a 200 ft contiguous inland area [2]. Tidal waters are classed in six Water Types, from Type 1 (Conservation) to Type 6 (Industrial Waterfronts and Commercial Navigation Channels), with development more permissive at the higher types [13]. The activity is matched against the water type and shoreline type in the tables of 650-RICR-20-00-1 § 1.1.5 to decide whether it is prohibited, a Category A (minor, staff-level) application or a Category B (major, Council-level, public notice) application [14]. Since June 26, 2023, RIGL 46-23-26 lets the public exercise shore rights up to 10 feet landward of the recognizable high tide line, which changes lateral access and privacy assumptions on a waterfront plan [15].

5. Low impact development is mandatory, and wetland buffers are measured flat. Under Minimum Standard 1 of the state stormwater rules, "LID site planning and design strategies must be used to the maximum extent practicable," and an applicant who rejects LID as infeasible must supply a specific rationale (250-RICR-150-10-8 § 8.7) [16]. On the plan that means less impervious cover, disconnected from the drainage system, with small infiltration areas close to the source, settled at concept stage. The unified freshwater wetlands rules, effective July 1, 2022, give every wetland a buffer zone of 25 feet to 200 feet, measured "perpendicularly, without regard for topography, outward from the edge of the freshwater wetland as a horizontal distance" (§ 3.23(F)(1)) [3]. An additional 25 feet is added where differing wetland types occur within 50 feet inward of the edge [3].

Map of the United States with Rhode Island highlighted
Locator map: Rhode Island highlighted. State boundaries: U.S. Census Bureau, 2024 Cartographic Boundary Files.
RV and glamping resort concept
Concept visualization

Approval layers: municipal and state, side by side

LayerBodyWhat it decides
Municipal, staffAdministrative officerCertifies applications complete; approves minor land development and minor subdivisions with no street creation or extension, variance or special-use permit [17]
Municipal, staffTechnical Review CommitteeComments and recommendations to the planning board; advisory, not final [12]
Municipal, boardPlanning board or commissionMajor land development and major subdivisions, and the zoning relief tied to them under UDR [1]
Municipal, boardZoning board of reviewStandalone variances and special-use permits not attached to a development project [7]
Municipal, staffBuilding officialBuilding permits under the state code, RIGL Ch. 23-27.3 [18]
StateCRMCCoastal assent, Category A or Category B [2, 14]
StateRIDEMConstruction stormwater, freshwater wetlands, onsite wastewater, underground storage tanks [4, 3]
StateRIDOTPhysical Alteration Permit for work affecting a state highway [19]
StateState Fire MarshalFire plan review, running parallel to building review [20]

Minor relief that qualifies as a "modification" is handled administratively by the zoning official [7]. Where a scenic roadway or historic resource is involved, RIDOT forwards the access application to the RI Historical Preservation and Heritage Commission and will not grant permission until its comments are addressed [19].

Above the zoning map sits the comprehensive plan. Under the Comprehensive Planning and Land Use Act (RIGL Ch. 45-22.2), the Division of Statewide Planning reviews and approves municipal comprehensive plans for consistency with the State Guide Plan, and municipal zoning must conform to the approved plan [21]. The Division publishes each municipality's plan status as Fully Approved, Partially Approved, Expired or Denied [22]. Inconsistency between zoning and an approved plan is a legal vulnerability, so read the plan status before you rely on a zoning designation.

Who prepares and seals what

Rhode Island's four design boards (professional engineers, land surveyors, architects and landscape architects) sit together in the Department of Business Regulation, Division of Design Professionals [18].

Work on the planWho seals itRule
Boundary and topographic surveysRhode Island Professional Land Surveyor435-RICR-00-00-1; responsible charge under RIGL 5-8.1-2 [23, 24]
Grading and drainage, stormwater, utility design, pavement and geometric designRhode Island Professional Engineer; the firm holds a Certificate of AuthorizationRIGL Ch. 5-8; COA under RIGL 5-8-24 [18, 25]
Building designRegistered architect; the firm holds a COARIGL Ch. 5-1; 5-1-15.1(c) [18]
Landscape, planting and certain grading, stormwater and erosion-control sheetsLandscape architectRIGL Ch. 5-51 [18]
RIDOT access plans, drainage calculations and any Traffic Impact StudyRhode Island Professional EngineerPAP commercial checklist [26]

Rhode Island registers engineers in 16 disciplines, and a PE may practice only within disciplines of competence; a licensed Civil Engineer may practice civil, structural and environmental engineering [18]. A PE may take on architectural work only where it is incidental to engineering and does not exceed 35,000 cubic feet of enclosed space (RIGL 5-1-14(2)) [18]. An out-of-state professional cannot seal Rhode Island drawings without Rhode Island registration, and the firm must hold a Rhode Island COA [25]. The PE in responsible charge must stamp any and all drawings the firm is required to stamp (430-RICR-00-00-1.5) [27]. The seal goes on final cover sheets and each original sheet, and interim or draft sheets must be identified as such (430-RICR-00-00-1.7) [28].

A preliminary site plan from Innowave Studio sits upstream of that sealed set. It carries the layout: building footprints, drive aisles, parking against the ordinance count, pads or units, amenities, and a site data table with acreage, zoning, density against the cap, setbacks and the dimensional relief the UDR hearing must decide. The plans are preliminary. Your surveyor supplies the boundary and topographic base, and your engineer of record takes the plan as the layout brief for the sealed grading, drainage, stormwater, utility and state highway access drawings. For the division of labor see who prepares a site plan, where unsealed site plans are accepted and preliminary vs final site plan; for how the studio works beside your team, see site plan consultant and site plan architect.

Statewide overlays and their thresholds

OverlayTrigger or standardWhat the plan shows
CRMC coastal zone200 ft inland of any coastal feature; activities in tidal waters [2, 14]Coastal feature line, the 200 ft contiguous area, the water type
Freshwater wetlands (RIDEM)Buffer zones of 25 to 200 ft from the wetland edge [3]Flagged wetland edge and the applicable buffer offset
RIPDES construction stormwater1 acre or more of disturbance, or less within a larger common plan of 1 acre or more [4]Limit of disturbance and disturbed acreage in the data table
LID standardRequired "to the maximum extent practicable" (§ 8.7) [16]Impervious cover reduced and disconnected
State Building Code2021 ICC codes with Rhode Island amendments, effective December 1, 2025 [29]Building type and occupancy assumptions
Fire review"The most restrictive provision of each code shall apply" [20]Runs parallel to building review, not after it
Flood hazard areasASCE 24 flood-resistant design referenced in the code; certificates by a registered design professional (RISBC-2 § R324) [30]FEMA zone lines against the building envelope
RIDOT Physical Alteration PermitAny work affecting a state highway; Traffic Impact Study at 100 or more new peak-hour trips [19, 5]Curb cuts and access on state roads

The CRMC layer reaches inland as well. CRMC has exclusive jurisdiction over freshwater wetlands "in the vicinity of the coast," including areas within 50 ft, riverbanks and flood plains, under its own freshwater wetland rules [14]. The Council also administers Special Area Management Plans, including the Salt Ponds Region SAMP (650-RICR-20-00-3) and the Narrow River SAMP (650-RICR-20-00-4), which can impose larger buffers and setbacks than the base rules [14]. For how coastal overlays change feasibility generally, see climate overlay zones and commercial feasibility.

Freshwater wetland buffer zones (250-RICR-150-15-3 § 3.23(H))

ResourceBuffer zone
Priority or named rivers, and drinking-water-supply reservoir watershed rivers200 ft [3]
Region 1 rivers, certain Region 2 rivers, cold-water fisheries rivers150 ft [3]
All other Region 2 rivers and all streams100 ft [3]
Ponds 10 acres or larger100 ft (named exceptions at 50 ft) [3]
Ponds 1/4 to under 10 acres50 ft [3]
Ponds under 1/4 acre, highway ponds25 ft [3]
Bogs and marshesGenerally 100 ft [3]
Vernal pools100 ft or 50 ft [3]
Smaller swamps25 to 75 ft [3]

These are representative distances. Urban Region distances are lower, with many ponds at 25 ft and many rivers at 50 to 150 ft [3]. The buffer is a layout input, not a detail: it sets where the parking field, pads and buildings can sit before any engineering begins.

Top jurisdictions

The statewide clocks and mandatory UDR apply in every municipality. What differs is the board, the special districts and the forms. Fee schedules and portals change as municipalities finish conformance amendments, so take the current schedule and application form from the planning department when you file.

JurisdictionWho reviewsWhat shapes the submission
ProvidenceCity Plan Commission, staffed by the Department of Planning and Development at 444 Westminster Street [31]Pre-application step, then master, preliminary and final stages for major land development; a UDR form with any zoning relief (checklist item 22) [31]; the Downcity Design Review Committee in the Downcity District [32]
WarwickWarwick Planning BoardSubdivision and land development applications and checklists published by the Planning Department [33]
East ProvidencePlanning Board, staffed by the Department of Planning and Economic DevelopmentThe same department staffs the Historic District and Waterfront Special Development commissions [34]
MiddletownPlanning boardRIDOT access correspondence posted in the town document center, including a 2025 applicability determination [35]
Cranston, Pawtucket, Woonsocket, North Kingstown, South Kingstown, Newport, WesterlyPlanning board and planning departmentReviewed under the statewide framework; confirm pre-application requirements, forms and fees with the department

In Providence, administrative officers review minor subdivisions, minor land development projects, and downtown development plan review outside the Downcity District [31]. Special districts add their own bodies: the I-195 Redevelopment District Commission for the 195 District, the Historic District Commission for historic overlays, and Capital Center regulations for that district [31, 32]. For the neighboring regimes, see Massachusetts, Connecticut and New Hampshire.

Asset registries for the classes the studio plans

AssetState ruleWhat it means for the site plan
RV parks and campgroundsRhode Island Department of Health license as a "recreation facility" under RIGL Ch. 23-21 and 216-RICR-50-10-3; a detailed scaled site plan showing sites, buildings and water supplies "must be approved by the Director prior to any construction and before any license can be issued" [36]The site plan is a licensing document. RIGL Title 32 Ch. 7 sets development and operation standards but does not supersede municipal zoning (RIGL Ch. 45-24) [37]; site size and density are set locally
GlampingNo state glamping classification is documentedHow a tent, yurt or cabin unit is classified is set locally
Fuel retailRIDEM UST Management Program, 250-RICR-140-25-1 [38]; tank registration $100 per tank per year, $35 late fee (Rule 6.13) [39]; an EPA-approved state program under 40 CFR Part 282 [40]Tank fields, dispensers and setbacks shown on the plan; noncompliant tanks are red-tagged, and delivery to them is prohibited [38]
Car washesRIPDES and RIDEM stormwater and discharge rules; wash-water reclaim or discharge may need groundwater discharge or UIC coverage through the unified RIDEM portal [41]Siting and design standards are set locally
MarinasCRMC assent under 650-RICR-20-00-1: a marina is any dock, pier, wharf, float or combination accommodating five or more recreational boats, bounded by a Marina Perimeter Limit that "defines and limits the area for structures to be located"; a concurrent RIDEM Water Quality Certification and Army Corps permit [14]A one-time MPL expansion for limited marinas in Type 2 waters, up to 25 percent of assented boat capacity, only after the applicant shows a more efficient configuration inside the MPL cannot do it [14]
Hotels and lodgingRhode Island Department of Health licensing under the food service and lodging health rulesLocal building, fire and zoning rules govern the site plan
Self storageNo specialized state operating licenseZoning, building and fire code, and stormwater rules govern

The RV park license, Title 32 standards and municipal zoning can all apply to the same parcel at once [36, 37]. For the waterfront permitting stack in more depth, see marina and waterfront development: USACE, coastal zone and municipal overlays.

Timelines and bottlenecks

StepStatutory clockAuthority
Certification of completeness25 days; 15 days with no street creation or extension and no UDRRIGL 45-23-50 [10]
Minor land development or subdivision, administrativePreliminary decision within 65 daysRIGL 45-23-38 [17]
Minor project with a street, UDR or waivers beyond the officer's authorityPlanning board hearing and decision within 95 daysRIGL 45-23-38 [17]
Major preliminary plan90 days from certification; extended if state permits are not yet in evidenceRIGL 45-23-39 [6]
Major final plan45 days from certificationRIGL 45-23-43 [11]
Missed deadlineDeemed approval; certificate from the administrative officer on requestRIGL 45-23-39, 45-23-40, 45-23-43 [6, 12, 11]

The bottlenecks are at the state agencies, not the municipal board. Because the preliminary-plan clock waits for state permits, a coastal or wetland-adjacent project that needs CRMC Category B assent, RIDEM wetlands review and RIPDES coverage runs past the municipal clocks [6]. RIPDES has a fast lane: a project that needs only the Construction General Permit and disturbs less than 5 acres qualifies for expedited review, with automatic authorization within 30 days of application receipt unless a full review is required [4].

RIDOT access review runs parallel to municipal review, but the applicant coordinates with the local engineer first [19]. A commercial application goes in as six collated copies of PE-stamped plans conforming to RIDOT Design Policy Memo 450.02, with two bound copies of PE-stamped drainage calculations, and a signed coordination letter proving the city engineer or local official received the plans; board minutes are not sufficient [26]. A layout that fixes curb cut locations early gives the engineer of record a stable base for that package. For the general sequence from concept to approval, see the commercial site plan process.

Proof points

  • Permits are rising. The state's 2024 Integrated Housing Report, dated April 15, 2025, counted 2,655 units permitted in 2024 (964 single-family, 1,691 multifamily), "the largest number of residential units permitted in a single year since 2005" [42].
  • No state-road impact, no access permit. In a 2025 Middletown applicability determination, RIDOT found that a Physical Alteration Permit was not required where the project had no state highway impacts [35].
  • Conformance is uneven. Block Island's ordinance amendments continued into late 2024 [9].
  • The building code moved. The prior code, based on the 2018 IBC, took effect February 1, 2022; the 2021 ICC codes with Rhode Island amendments took effect December 1, 2025 [29].

Innowave Studio prepares preliminary site plans for developers across the service areas, with the Rhode Island layers above built into the layout from the first draft. See site plan services for the full scope, or start a project.

Frequently asked questions

Do Rhode Island counties approve site plans?

No. The five counties are geographic designations with no land use, permitting or planning function. Approvals are municipal (the planning board, or the administrative officer for minor projects) or come directly from a state agency, and the municipal clock on a major preliminary plan is extended until evidence of required state permits is provided [6].

Is Unified Development Review mandatory in Rhode Island?

Yes. Since January 1, 2024, zoning ordinances must provide that variances and special-use permits for a property undergoing review that qualifies for unified development review are conducted and decided by the authorized permitting authority, in practice the planning board, in the same proceeding as the development application [1].

When do I need a CRMC assent?

For development on or within 200 feet of the most inland shoreline feature, for activities in tidal waters, and for certain watershed and activity triggers. The water type and shoreline type decide whether the activity is prohibited, a Category A application or a Category B application [2, 14].

Do I need both CRMC and RIDEM permits?

Often, yes. CRMC assent is separate from and additional to RIDEM permits, and CRMC has exclusive jurisdiction over freshwater wetlands in the vicinity of the coast [14].

When is a RIPDES construction stormwater permit required?

At one acre or more of land disturbance, or under one acre if the work is part of a larger common plan totaling one acre or more [4]. Projects that need only the Construction General Permit and disturb less than 5 acres qualify for expedited review [4].

What triggers a RIDOT Traffic Impact Study?

A project generating 100 or more new vehicle trips per hour during peak traffic, or a project within an already-congested area [5]. Where it is triggered, the study is filed as a PE-stamped document with the Physical Alteration Permit application [26].

What happens if the planning board misses its deadline?

Failure to act within the prescribed period constitutes approval, and the administrative officer issues a certificate to that effect on request [6, 11, 12].

Can an out-of-state engineer seal Rhode Island plans?

Only after obtaining Rhode Island registration, and the firm must also hold a Rhode Island Certificate of Authorization. There is no courtesy exception [25].

Sources

  1. 1)RIGL 45-24-46.4, Unified development review (effective January 1, 2024), Rhode Island General Assembly. Accessed 2026-08-31.
  2. 2)About CRMC: jurisdiction, Rhode Island Coastal Resources Management Council. Accessed 2026-08-31.
  3. 3)250-RICR-150-15-3, Rules and Regulations Governing the Administration and Enforcement of the Freshwater Wetlands Act, Rhode Island Department of Environmental Management (RI Secretary of State rules database). Accessed 2026-08-31.
  4. 4)Construction stormwater permitting (RIPDES Construction General Permit), Rhode Island Department of Environmental Management. Accessed 2026-08-31.
  5. 5)290-RICR-20-00-14 and the RIDOT traffic impact study instructions, as quoted in RAPID Roadmap 3-RI-d, OpenEI (quoting the Rhode Island Department of Transportation). Accessed 2026-08-31.
  6. 6)RIGL 45-23-39, Major land development and major subdivision: preliminary plan, Rhode Island General Assembly. Accessed 2026-08-31.
  7. 7)Major changes coming to Rhode Island's zoning and land use law in 2024, apslaw.com. Accessed 2026-08-31.
  8. 8)Summary of changes to land use acts as a result of the 2023 legislative session, RIBuilders (ribuilders.org). Accessed 2026-08-31.
  9. 9)Council approves new zoning amendments, The Block Island Times. Accessed 2026-08-31.
  10. 10)RIGL 45-23-50, Certification of completeness, Rhode Island General Assembly. Accessed 2026-08-31.
  11. 11)RIGL 45-23-43, Major land development and major subdivision: final plan, Rhode Island General Assembly (via Justia). Accessed 2026-08-31.
  12. 12)RIGL 45-23-40, Major land development and major subdivision: master plan, Rhode Island General Assembly. Accessed 2026-08-31.
  13. 13)Water type classifications, Rhode Island Coastal Resources Management Council. Accessed 2026-08-31.
  14. 14)650-RICR-20-00-1, Coastal Resources Management Program (the Red Book), Rhode Island Coastal Resources Management Council (RI Secretary of State rules database). Accessed 2026-08-31.
  15. 15)RIGL 46-23-26, Shoreline access, Rhode Island General Assembly. Accessed 2026-08-31.
  16. 16)250-RICR-150-10-8, Rhode Island Stormwater Management, Design and Installation Rules, Rhode Island Department of Environmental Management (RI Secretary of State rules database). Accessed 2026-08-31.
  17. 17)RIGL 45-23-38, Minor land development and minor subdivision, Rhode Island General Assembly (via Justia). Accessed 2026-08-31.
  18. 18)Reference Guide for the Design and Construction Industries, Rhode Island Department of Business Regulation. Accessed 2026-08-31.
  19. 19)Physical Alteration Permit (PAPA) Manual, Rhode Island Department of Transportation. Accessed 2026-08-31.
  20. 20)510-RICR-00-00-1, Rhode Island State Building Code (RISBC-1), Building Code Standards Committee (RI Secretary of State rules database). Accessed 2026-08-31.
  21. 21)Rhode Island Comprehensive Planning and Land Use Regulation Act, Rhode Island Division of Statewide Planning. Accessed 2026-08-31.
  22. 22)Comprehensive plans and state approval status, Rhode Island Division of Statewide Planning. Accessed 2026-08-31.
  23. 23)435-RICR-00-00-1, Rules of the Board of Registration for Professional Land Surveyors, State Board of Registration for Professional Land Surveyors (RI Secretary of State rules database). Accessed 2026-08-31.
  24. 24)RIGL 5-8.1-2, Land surveyors: definitions, Rhode Island General Assembly. Accessed 2026-08-31.
  25. 25)Professional Engineers: registration and Certificate of Authorization, Rhode Island Division of Design Professionals (bdp.ri.gov). Accessed 2026-08-31.
  26. 26)Physical Alteration Permit checklist instructions, commercial, Rhode Island Department of Transportation. Accessed 2026-08-31.
  27. 27)430-RICR-00-00-1.5, Professional engineers: responsible charge, State Board of Registration for Professional Engineers (via Justia Regulations). Accessed 2026-08-31.
  28. 28)430-RICR-00-00-1.7, Professional engineers: seals, State Board of Registration for Professional Engineers (via Cornell LII). Accessed 2026-08-31.
  29. 29)Laws, rules and regulations (State Building Code), Rhode Island Building Code Commission. Accessed 2026-08-31.
  30. 30)510-RICR-00-00-2.5, Rhode Island One and Two Family Dwelling Code (RISBC-2), flood-resistant construction, Building Code Standards Committee (via Cornell LII). Accessed 2026-08-31.
  31. 31)Major Land Development Project application checklist, City of Providence, Department of Planning and Development. Accessed 2026-08-31.
  32. 32)Downtown Design Review Committee (DDRC), City of Providence. Accessed 2026-08-31.
  33. 33)Planning Department: applications and checklists, City of Warwick. Accessed 2026-08-31.
  34. 34)Department of Planning and Economic Development, City of East Providence. Accessed 2026-08-31.
  35. 35)RIDOT PAP 25-157 applicability determination letter, Town of Middletown document center. Accessed 2026-08-31.
  36. 36)216-RICR-50-10-3, Licensing of Recreational Facilities and Beaches, Rhode Island Department of Health (RI Secretary of State rules database). Accessed 2026-08-31.
  37. 37)RIGL 32-7-7, Recreational Vehicle Parks and Campgrounds Act, Rhode Island General Assembly. Accessed 2026-08-31.
  38. 38)250-RICR-140-25-1, Underground Storage Tank Management Program rules, Rhode Island Department of Environmental Management (RI Secretary of State rules database). Accessed 2026-08-31.
  39. 39)DEM Underground Storage Tank Registration, State of Rhode Island (RI.gov). Accessed 2026-10-09.
  40. 40)40 CFR Part 282, Approved Underground Storage Tank Programs, eCFR. Accessed 2026-10-09.
  41. 41)Stormwater permitting, Rhode Island Department of Environmental Management. Accessed 2026-08-31.
  42. 42)2024 Annual Integrated Housing Report (April 15, 2025), Rhode Island Executive Office of Housing. Accessed 2026-08-31.

All states and metros

Start a project

Bring us the site. We draw the first plan.

Send the parcel, the program and anything you already have: a survey, a sketch, a zoning letter. The studio returns a preliminary site plan your engineer of record can build on.

Start a project