Services / Interiors and conversions

Commercial interiors and conversions

Interior visualization and renders for developers, including stand-alone render jobs on plans the studio did not draw, and conversions such as office or retail to restaurant. This page sets out what an interior or conversion render has to show, who reviews it and the standards it follows.

Last reviewed

Product line
Interior visualization and renders, stand-alone render jobs, and conversions such as office or retail to restaurant
Hotel brand review
PIP submissions include specifications and illustrations, reviewed by the brand before procurement [1]
Altered listing images (California)
AB 723: disclosure and access to originals, effective January 1, 2026 [2]
Unflagged upgrades (UK precedent)
Taylor Wimpey show-home image ruled misleading, November 14, 2012 [3]
Final design review (Cleveland)
Signage, lighting and material samples [4]
Restaurant conversion, San Antonio
Change of occupancy to Group A-2; construction documents by a design professional for all Group A [5]
3D render of the converted industrial hall set for a banquet, with round tables, planting and string lights under the restored trusses
Historical venue renovation: banquet layout render.

What the line covers

Commercial interiors and conversions is the studio's third product line, beside preliminary site plans and the exterior, aerial and flyover work on 3D rendering services. It covers interior visualization and renders, including stand-alone render jobs on projects where the studio did not draw the site plan, and conversions: office or retail space to a restaurant, and similar changes of use.

An interior still is a perspective of an enclosed space, such as a lobby, an amenity floor, a typical suite or a dining room. Developers use it for leasing spec suites and lobbies, for hospitality and for amenity marketing, and it earns its place where the experience of the space is the selling point: Class A office, hospitality, residential amenity. Furniture, fixtures and equipment (FF&E) and styling drive the effort. A conversion adds a second image to the set: the space as it stands, beside the space as proposed.

A historical venue renovation

The studio's previous site presents one conversion under the title "Industrial Charm: Historical Venue Renovation". In its words, a restored historical building was transformed into an industrial-chic venue: the team renovated the space, enhancing its original industrial character to create a stylish and versatile event destination for celebrations, weddings, concerts and work parties, and redesigned the site plan for an optimal layout. The images on this page come from that project: the space before conversion, a banquet layout and an event layout.

The set shows the two things a conversion set has to carry. The before view records the existing condition the design starts from. The banquet and event views show the same converted space furnished for two uses: the versatility the project description claims, shown rather than stated.

What an interior or conversion render has to show

The professional standard is testable, not a matter of adjectives:

ElementProfessional standardAmateur tell
CameraReal eye height, two-point perspective, verticals correctedUltra-wide distortion that inflates the space, tilted verticals, impossible camera positions
MaterialsPhysically based materials with correct roughness and scale, calibrated to manufacturer samples where specifiedStretched textures, mirror-like glass, uniform tiling
LightingInterior lights balanced against the daylight or dusk sky; consistent exposure; no noise or firefliesFlat ambient light; glowing windows with nothing behind them
PeopleScaled to real figures, grounded with contact shadows, dressed for the climate and season, doing what the program doesCut-out figures floating, wrong scale, one stock figure repeated
HonestyAssumptions disclosed; upgrades and optional finishes flaggedUpgrades shown as standard, unflagged [3]

For a restaurant or venue conversion, the useful pair is the room at eye level, furnished as laid out, and a dusk view of the frontage: the same camera with a low sun or blue-hour sky, the interior lights on and the signage lit. The dusk view is the hero image for hospitality and retail marketing; entitlement exhibits use daylight.

Office or retail to restaurant: the conversion path

The restaurant conversion model project works one city's rules through from zoning to the food permit, and the rules below are San Antonio's; the state overview is on site plans in Texas. Converting an office (Group B) or retail (Group M) suite into a full-service restaurant is a change of occupancy to Group A-2, run on the city's 2024 code set (Ordinance 2025-01-30-0075, effective May 1, 2025) [5, 6]. Existing buildings undergoing a change of occupancy "shall be permitted to comply with the International Existing Building Code, as amended in Article V of this chapter" (City Code Sec. 10-2(d)(1)b), and no change of occupancy is made until the Building Official issues a certificate of occupancy (Sec. 10-12(a)) [5]. Zoning comes first: the city lists restaurants as permitted in the NC district (building size limited to 3,000 SF) and in C-1, C-2 and C-3 [7], while the office districts O-1 and O-2 take a rezoning before Zoning Commission and City Council [8].

StepApprovalBody and codeSeal
1Zoning verification or rezoningDSD Zoning; the Zoning Commission recommends and City Council decidesNo; a site plan may accompany it [8]
2IEBC preliminary meeting, before the construction permit applicationBuilding Official, City Code Sec. 10-5(c), on requestNo, though the Building Official may require an evaluation by a registered design professional [5]
3TDLR project registration and RAS plan reviewGov't Code 469.101 and 469.105, at $50,000 or more of construction costThe RAS reviews the sealed set [9]
4Building, MEP and fire review, with Metro Health plan reviewDSD and the fire department, Secs. 10-6 and 10-8Yes: a design professional for Group A (Sec. 10-8(a)(1)), and a PE for electrical plans above 600 A at 250 V or less, or above 400 A at more than 250 V (Sec. 10-8(a)(6)) [5]
5Grease interceptorDSD plumbing review and the SAWS FOG program, City Code Ch. 34, Secs. 34-526 to 34-531Plumbing design in the design professional's set [10]
6AlcoholTABC and City review under Alcoholic Beverage Code 109.33 and City Code Sec. 4-6; a distance variance is heard 30 to 45 days after a complete filingDistance survey by a licensed surveyor or engineer [11]
7Sidewalk café in the downtown right-of-wayCenter City Development and Operations, City Code Ch. 32, Art. IV; an annual permit of $250, $500 or $750 by sizeNo; a site plan at least 8.5 x 11 in [12, 13]
8Certificate of occupancy, then the food establishment permitBuilding Official, Sec. 10-12; Metro Health: "A valid CofO must be presented at the time you wish to purchase a food permit"; $310, $618 or $928 a year by sales tierNo [5, 14, 15]

The numbers that shape a restaurant layout in an existing shell:

StandardValue
Sprinklers, IBC 903.2.1.2Required throughout the stories with a Group A-2 occupancy where the fire area exceeds 5,000 square feet, the fire area has an occupant load of 100 or more, or it sits on a floor other than a level of exit discharge [16]
Occupant numbersThe construction documents designate the occupants on every floor and in all rooms and spaces (Sec. 10-8(b)(3)) [5]
Certificate of occupancyStates the design occupant load and whether sprinklers are required (Sec. 10-12(b)(10), (11)) [5]
Kitchen and warewashingA 3-compartment sink with two integral drainboards; a dish machine rinse of not less than 180 degrees F; handwashing in each food prep area, server station and warewashing area (IB 139) [17]
GreaseEvery fixture that may discharge fats, oils or grease drains to a properly maintained and functioning interceptor (Sec. 34-526(b)) [10]
Alcohol distanceNo sales within 300 ft of a church, school or hospital, measured under Alcoholic Beverage Code 109.33(b) (City Code Sec. 4-6(a)) [11]
AccessibilityTDLR registration and RAS review at $50,000 or more of construction cost [9]
Sidewalk caféAt least 6 ft left clear for pedestrians [12]

What the concept layout and renders carry, and what the design professional adds for the permit:

ItemConcept layout and rendersDesign professional adds for permit
Floor planA dimensioned concept planThe final plan to scale (Sec. 10-8(b)(1)) [5]
Occupants and egressRooms and the egress route as laid outCertified occupant numbers and the full means of egress (Sec. 10-8(b)(3)) [5]
KitchenEquipment and fixture locations, including the 3-compartment sink, handsinks, mop sink and dish machinePlumbing, hood, electrical and gas design, with fixtures specified to IB 139 [17]
FinishesFinish boards and rendersA finish schedule of cleanable surfaces
Grease interceptorIts location on the siteThe sized plumbing design under the IPC as amended
SitePatio, parking count, interceptor and dumpsterA site plan based on a boundary survey, which may be waived for alterations (Sec. 10-8(b)(6)) [5]
Sidewalk caféSeating plan, sidewalk widths, the 6 ft clear path, hydrants and building entrancesInsurance, and copies of the HDRC and TABC approvals [12]
AlcoholA radius mapA certified survey within 1 year of the TABC application [11]

In San Antonio the unsealed stages are the IEBC preliminary meeting, the zoning application site plan, the sidewalk café application and HDRC conceptual review; the sealed stage is the building permit set for Group A [5, 13]. Other jurisdictions' written acceptance of unsealed plans is collected in where unsealed site plans are accepted.

Who reviews the images

ReviewerWhat the record shows
Hotel brand, for a PIP or a conversion to a flagPIP submissions include specifications and illustrations of proposed modifications, reviewed by the brand before procurement [1]; brand technical services approve plans, specifications and changes [18]
Design review, where the exterior changesCleveland asks for signage, lighting and material samples at final review, with signage illumination, attachment and color specifications [4]; Scottsdale asks for color elevations, refuses gray copies, and wants physical material boards before the hearing [19]
Historic and Design Review Commission, San AntonioThe San Antonio Report reported a 6-2 HDRC approval of the Rosario's restaurant plan in 2021, conditioned on a greater fencing setback and on final landscaping and mural designs [20]; HDRC minutes of September 4, 2024 carry the standard stipulation "That all mechanical equipment be screened from view from the right of way" [21]
Construction lenderProvident Bank asks for a description of materials, building permits and approved plans [22]; Self-Help lists site plan, renderings and schematics [23]
Buyers and tenantsAdvertising and listing rules on accuracy, altered images and upgrades, set out in the next section

The documented brand requirements are drawings, specifications and illustrations [1, 18]. Every reviewer in the table is reading the same thing: the materials, lighting and signage of the finished project. The finishes in the render and the samples on the material board have to be the same finishes.

warehouse adaptive reuse
Representative image
urban office building
Representative image
older office building
Representative image

Accuracy and disclosure for interiors

Interior marketing images are what the Landscape Institute's Technical Guidance Note 06/19 calls illustrative visualizations: intended for marketing, and not bound to specific viewpoints (paras 1.2.2 to 1.2.3) [24]. They still have to be fair. FTC staff's .com Disclosures guidance (2013) states that a disclosure only qualifies or limits a claim and cannot cure a false claim [25]. New York's rule for offering-plan advertising requires an artist's rendering to be marked as one and to depict the dimensions, height and landscaping of the property accurately and realistically [26].

Three rules bear directly on interiors and on images of existing buildings:

Rule or rulingWhat it requires
UK ASA, Taylor Wimpey (November 14, 2012), comparativeA show-home image was ruled misleading because upgrades were not flagged; CAP guidance now requires a notice that the image includes optional upgrades at additional cost, equally prominent to the price claim and adjacent to the image [3]
California AB 723, effective January 1, 2026Licensees disclose digitally altered listing images and provide access to the originals [2]
Metro MLS (Wisconsin) from September 1, 2026; Wisconsin Act 69 from January 1, 2027Originals and disclosure, with $10 per day penalties (Metro MLS); disclosure of technology-altered ads that mislead (Act 69) [27]

The California and Wisconsin rules are written for listing images of existing property. The scale of the problem they answer: a vendor analysis reported with the California law reviewed about 40,000 primary listing photos in Q1 2026, found 10.8% manipulated, and found more than 90% of those undisclosed [2]. A conversion set that shows the existing condition beside the proposal, each labeled, keeps the original in view.

Stand-alone render jobs: what goes in

When the studio did not draw the plan, the model is built from the client's drawings, and the render can only be as accurate as its inputs:

InputWhy it mattersIf it is missing
CAD or BIM files (DWG, RVT, SKP, 3DM, IFC)Geometry accuracyModeled from PDF drawings at a stated scale, with each assumption written down
The current drawing set, superseded sheets markedThe model follows the live designViews built on an old sheet
Elevations and sectionsFacade rhythm, floor-to-floor heights, parapetsProportions guessed
Material schedule, manufacturer samples, brand colorsMaterial accuracy and brand consistencyGeneric materials and revision churn at the materials stage
Photographs of the existing spaceContext fidelity and the before view of a conversionA fully modeled context, less credible
Intended use, deadline and decision-makerSets the views, resolution and moodViews that answer the wrong question

The professional sequence is gated: a brief, a base model, a clay or grey-scale review that locks geometry and cameras, a colored draft that locks materials and lighting, the final render, and post-production. A revision round is one consolidated set of written feedback from one named coordinator. Material tweaks, lighting balance, small styling swaps, signage and entourage changes, and small camera moves after a view is selected are revisions; new camera angles, design rework after approval and model rebuilds from new drawings are changes of scope. Photoreal imagery of a space that is not yet designed creates exactly the expectation gap the disclosure rules address, so at concept stage the materials are labeled as indicative.

What the architect and engineer of record add

Interior renders and conversion layouts are preliminary design. The sealed drawings for a change of use, including structure and the electrical, plumbing and mechanical design, are drawn by the client's architect and engineer of record, who build on the layout. For a restaurant, the occupancy is assembly, and the states draw the architect line in different places:

PlaceWhen the conversion needs an architect or design professional
San Antonio, TexasA design professional prepares the construction documents for all Group A (Assembly) occupancies (City Code Sec. 10-8(a)(1)) [5]
Texas, statewideThe Architects Act exempts a private commercial building of 2 stories or less and 20,000 sq ft or less (Occ. Code 1051.606(a)(4)(D)) [28]
GeorgiaThe single-story exemption up to 5,000 sq ft excludes assembly occupancies, which need an architect's seal (O.C.G.A. 43-4-14(b)) [29]
LouisianaFor new construction, changes in occupancy, additions and renovations costing more than $125,000, an architect is the professional of record above 2,650 sq ft of assembly space (R.S. 37:155) [30]
KentuckyAn architect is required for an assembly use group with a capacity of 100 persons or more (KRS 323.033(1)(a)) [31]
OklahomaAt 2 stories or fewer, A-2 buildings with 50 or fewer occupants are exempt (59 O.S. 46.21b) [32]
AlabamaAny building of 2,500 square feet or larger that is erected, enlarged or altered needs a registered architect, other than those exempted (Ala. Admin. Code 100-X-4-.02) [33]
ArizonaConcept drawings go to a review body unsealed when marked "preliminary," "draft" or "not for construction" (A.A.C. R4-30-304(D)) [34]

Where a conversion changes the site, the preliminary site plan carries the layout. Restaurant parking demand and grease interceptor placement are covered on retail center site plans; floorplate depth and conversion screens are on office site plans.

For hotel conversions, the brand review path and prototype inputs are on hotel site plans, with a select-service hotel model project in Murfreesboro, Tennessee, and the exterior view set on hotel rendering. Further reading: the future of interior design, the chain restaurant outlook, office-to-multifamily conversion returns and office to life science conversions. Model projects in real jurisdictions are under case studies; to start a project, use the project form.

Empty historic industrial hall with steel roof trusses, brick walls and arched windows, before conversion
Historical venue renovation: the hall before conversion.
3D render of the converted industrial hall as a concert venue, with stage lighting and table seating
Historical venue renovation: event layout render.

Frequently asked questions

Does a hotel brand require renderings for a PIP or a conversion?

The documented requirements are drawings, specifications and illustrations. PIP submissions include specifications and illustrations of proposed modifications, reviewed by the brand before procurement [1], and brand technical services approve plans, specifications and changes [18].

Do upgraded finishes in an interior render need a label?

In the UK, yes: the ASA ruled a show-home image misleading in Taylor Wimpey because upgrades were not flagged, and CAP guidance requires the notice next to the image [3]. In New York, an artist's rendering in offering-plan advertising must be marked as one and depict the property accurately [26].

Is an altered photo of an existing space treated differently from a rendering?

Listing rules now reach it. California AB 723 requires licensees to disclose digitally altered listing images and provide access to the originals [2]. Wisconsin Act 69 requires disclosure of technology-altered ads that mislead from January 1, 2027 [27].

Can AI produce the interior renders?

Practitioners cite technical precision, consistency across a set and fidelity to the brief as needing human-controlled pipelines [35], and generative output has no persistent 3D model, so geometry can drift between views [36].

Who owns an AI-assisted marketing image?

The US Copyright Office's January 2025 report concluded that prompts alone do not establish authorship, while human-authored, separable contributions remain protectable, judged case by case [37].

What does design review ask for when a conversion changes the storefront?

Cleveland asks for signage, lighting and material samples at final review, including signage illumination, attachment and color specifications [4]. Scottsdale's Development Review Board asks for color elevations, refuses gray copies, and wants physical material boards before the hearing [19].

Does an office or retail to restaurant conversion need an architect?

For the permit set, often yes. In San Antonio, construction documents by a design professional are required for all Group A (Assembly) occupancies (City Code Sec. 10-8(a)(1)) [5], and a full-service restaurant is Group A-2. Louisiana makes an architect the professional of record for changes in occupancy costing more than $125,000 once an assembly space exceeds 2,650 sq ft [30], and Kentucky requires an architect for an assembly use group with a capacity of 100 persons or more [31]. The concept layout and the renders come first; the design professional builds the permit set on them.

Does a construction lender need interior renders?

It depends on the lender. Self-Help's commercial real estate loan checklist lists site plan, renderings and schematics [23]; Provident Bank's construction application checklist asks instead for a description of materials, building permits and approved plans [22].

Sources

  1. 1)You received a hotel property improvement plan. Now what?, Hotel-Online. Accessed 2026-10-07.
  2. 2)Most AI-altered listings go undisclosed; California law bans it, HousingWire. Accessed 2026-10-07.
  3. 3)Property: New build and off plan homes, Advertising Standards Authority and CAP (UK). Accessed 2026-10-07.
  4. 4)Design Review Checklist (2023), City of Cleveland, OH. Accessed 2026-10-07.
  5. 5)Chapter 10, Building-Related Codes (effective May 1, 2025), City of San Antonio, Development Services Department. Accessed 2026-10-10.
  6. 6)Ordinance 2025-01-30-0075, adopting the 2024 building-related codes, City of San Antonio (Municode library). Accessed 2026-10-10.
  7. 7)Examples of Uses Permitted (updated 08/20/21), City of San Antonio, Development Services Department. Accessed 2026-10-10.
  8. 8)Zoning application, Development Services Department Zoning Section, City of San Antonio, Development Services Department. Accessed 2026-10-10.
  9. 9)Project Registration form EAB205N (August 2023), Texas Department of Licensing and Regulation. Accessed 2026-10-10.
  10. 10)Fats, Oils and Grease ordinance (City Code Chapter 34, Division 5), San Antonio Water System. Accessed 2026-10-10.
  11. 11)Information Bulletin 168, alcohol sales and distance requirements, City of San Antonio, Development Services Department. Accessed 2026-10-10.
  12. 12)Sidewalk Cafe General Application, City of San Antonio, Center City Development and Operations. Accessed 2026-10-10.
  13. 13)Sidewalk Cafe Permit, City of San Antonio, Center City Development and Operations. Accessed 2026-10-10.
  14. 14)Food Establishment License, City of San Antonio, Metropolitan Health District. Accessed 2026-10-10.
  15. 15)City of San Antonio fee schedule, food establishment permit, Texas Department of State Health Services, local ordinance registry. Accessed 2026-10-10.
  16. 16)2021 International Fire Code, section 903.2.1.2, Group A-2, International Code Council. Accessed 2026-10-10.
  17. 17)Information Bulletin 139, Health Department plan review, City of San Antonio, Development Services Department. Accessed 2026-10-10.
  18. 18)Protecting hotel brand standards with architect agreements, Akerman LLP. Accessed 2026-10-07.
  19. 19)Development Review Board (DRB) Development Application Checklist, sample, City of Scottsdale, AZ. Accessed 2026-10-07.
  20. 20)HDRC approves new Rosario's restaurant plan over neighbor's objections, San Antonio Report. Accessed 2026-10-10.
  21. 21)Historic and Design Review Commission minutes, September 4, 2024, City of San Antonio, Office of Historic Preservation. Accessed 2026-10-10.
  22. 22)Construction application checklist, Provident Bank. Accessed 2026-10-07.
  23. 23)Commercial real estate loan checklist, Self-Help. Accessed 2026-10-07.
  24. 24)Visual Representation of Development Proposals, Technical Guidance Note 06/19, Landscape Institute. Accessed 2026-10-07.
  25. 25).com Disclosures, FTC staff guidance (2013), Federal Trade Commission. Accessed 2026-10-07.
  26. 26)N.Y. Comp. Codes R. and Regs. tit. 13, sec. 22.6 (offering-plan advertising), New York Codes, Rules and Regulations (via Justia). Accessed 2026-10-07.
  27. 27)AI listing photo rules, The Close. Accessed 2026-10-07.
  28. 28)Texas Occupations Code section 1051.606, exemptions from the Architects Act, Texas Legislature (via texas.public.law). Accessed 2026-10-10.
  29. 29)O.C.G.A. 43-4-14 (2024) (law.justia.com), Georgia General Assembly (via Justia). Accessed 2026-08-02.
  30. 30)La. R.S. 37:155, Louisiana Legislature (via Justia). Accessed 2026-08-31.
  31. 31)KRS 323.033, buildings that require an architect, Kentucky General Assembly. Accessed 2026-10-10.
  32. 32)59 O.S. 46.21b, architects required for certain buildings (2025 text), Oklahoma Legislature (via Justia). Accessed 2026-10-10.
  33. 33)2025 Architect Handbook (Ala. Admin. Code 100-X-4-.02), Alabama Board of Architects. Accessed 2026-10-10.
  34. 34)A.A.C. R4-30-304, Use of Seals, Arizona State Board of Technical Registration. Accessed 2026-10-10.
  35. 35)AI and the future of arch viz, AEC Magazine. Accessed 2026-10-07.
  36. 36)How AI reshaped the render, and what it still can't build (secondary source), Architecture Lab. Accessed 2026-10-07.
  37. 37)Copyright Office AI report, part two: creative prompting and authorship, IPWatchdog. Accessed 2026-10-07.

Start a project

Bring us the site. We draw the first plan.

Send the parcel, the program and anything you already have: a survey, a sketch, a zoning letter. The studio returns a preliminary site plan your engineer of record can build on.

Start a project