Tools / RV parks

RV park and campground calculator

Enter the gross acres, the state and the site mix. The calculator checks the site count against any verified density cap, then gives a preliminary estimate of the NEC 551 receptacles and calculated load, the design flow and the review thresholds it crosses, the fixtures, the PM peak trips and the road widths, each with its source.

Run the RV park numbers

How this works

Enter the gross acres and the state, and pick the county or city where our research holds a local rule. Then enter the site mix: full-hookup RV sites, partial-hookup sites with water and power but no sewer, RV sites with no hookups, and tent or primitive sites. The calculator returns a preliminary estimate for each part of the program a preliminary site plan carries in its site data table, and it names the rule behind every figure. The inputs stay in the link, so a result can be shared and reopened.

The calculator does not compute internal road length, a layout or pad sizes: no source in our research supplies a method for them. A drawn RV park site plan does that work on the actual parcel.

Sites per acre

The calculator estimates no site count from a density observed in approvals. The density statistics and clusters our research found are computed over a set of approvals that includes machine-written meeting summaries, which the research itself says should be replaced with staff reports before public use, so none of them is shown. The calculator checks the site mix you enter against any verified density cap instead, and lists the approvals below as evidence, not as a rate.

Four approvals with primary documents show the spread. The Uintah County Planning Commission approved Rhoades RV Park unanimously, with 38 RV sites on 1.71 gross acres, or 22.2 sites per gross acre [1]. The Grants Pass Urban Area Planning Commission approved Jantzer RV Park 7-0, with 87 RV sites on 5.83 gross acres, or 14.9 per acre [2]. In Palm Beach County, the West Atlantic RV Resort staff report counts 113 RV sites and 8 camping cabins, 121 in all, on 10.11 gross acres, or 12.0 per acre [3]. The Adirondack Park Agency approved Woods Hollow RV Park unanimously, with 277 sites on 83.4 acres, or 3.3 per acre [4]. The guide to RV sites per acre covers the planning side of these numbers.

Density caps and minimum park size

Where our research verified a density cap stated per acre, the calculator caps the count, names the cap and keeps the lowest where several apply. Florida caps RV parks at 25 RV units per gross acre statewide for new or modified parks, and sets 1,200 sf per RV space and 500 sf per tent space [5]. Local codes can be stricter. Palm Bay, Florida, caps RV parks at 15 RV sites per gross acre, with a 10 acre minimum park size [6]. Sutherlin, Oregon, allows 22 sites per acre, or 25 with a density bonus, with a 2 acre minimum [7]. Alamosa County, Colorado, allows 8 sites per acre on average, with a 12 acre minimum [8]. Parker County, Texas, requires a 5.0 acre minimum tract and allows 60 spaces maximum on a 5.0 acre tract [9], and the calculator shows that cap as written rather than turning it into a rate per acre. The Florida RV park page and the Polk County model project show the Florida cap on a drawn site.

Michigan requires a 1,200 sf minimum site area, 15 ft of road frontage per site and a 4 ft clear path around each unit in all campgrounds [10]. The calculator multiplies each minimum site area by the sites entered and reports the share of the gross area the sites alone take, before roads and amenities.

Electrical load under NEC Article 551

NEC 551.71 requires 30 A, 125 V receptacles at 70 percent of electrified sites and 50 A receptacles at 40 percent of new sites (20 percent of existing), with every 50 A site also carrying a 30 A receptacle [11]. The 50 A share for new sites was raised from 20 to 40 percent in the 2017 NEC [12]. Dedicated tent sites with 15 or 20 A supply may be excluded when computing the 30 A and 50 A percentages [13]. The calculator uses the minimum 50 A share unless you enter a count, and gives every other powered RV site a 20 A and a 30 A receptacle.

For the calculated load, 551.73(A) counts 12,000 VA per 50 A site, 3,600 VA per site with both 20 A and 30 A, 2,400 VA per site with 20 A only and 600 VA per dedicated tent site with 20 A only [14]. Table 551.73(A) demand factors fall from 100 percent at 1 site to 41 percent at 36 or more sites, and they do not apply to bathhouses, recreation buildings, pools and similar loads [14]. In a published worked example, 20 sites at 45 percent of 3,600 VA gives 1,620 VA per site, or 32,400 VA in total [15]; the first worked example below repeats it.

These NEC values come from secondary reproductions of the code tables, and the calculator labels them that way. Which NEC edition a state has adopted is not verified in our research, so each result states the edition logic it uses: the values from 2017 onward, with the earlier 20 percent share and 9,600 VA basis for a 50 A site shown beside them [12, 14].

Water and wastewater design flows

The calculator multiplies the sites of each kind by the state's design flow, adds them, and compares the total with the state's review thresholds. Texas sets 50 gpd per travel trailer or RV park space, or 40 gpd with water-saving devices, and per-person rates for parks with a bathhouse (15 gpd, or 12 with devices) and without one (10 gpd, or 8) [16]. Its Chapter 285 on-site sewage rules apply to an RV park only with combined wastewater flow of less than 5,000 gallons per day [16]. Michigan sets 75 gal per site for sites with water and sewer outlets and for sites served by service buildings, 30 gpd per primitive site and 150 gal per park model site [10]. Michigan wells must deliver at least 30 gpm, or the sum of 1 gpm per park model connection plus 0.5 gpm per other site connection if that is higher [10].

North Carolina's 18E table sets 100 gal per RV space, 70 gal per campsite served by a bathhouse and 150 gal per park model space [17]. Its 02T table for non-discharge permits sets 100 gal per campsite with hookups, 75 without, and 50 gal per space for a campground dump station [18]. The local health department may approve RV park systems up to 1,500 gpd, and state review is required above 3,000 gpd unreduced design daily flow, for unapproved advanced pretreatment or for any system receiving dump-station waste [19]. The North Carolina RV park and Texas RV park pages cover the rest of each state's approval path.

Every state applies at least the federal public water system test: at least 15 service connections, or regularly serving an average of at least 25 individuals daily at least 60 days a year [20]. The calculator compares persons only when you enter persons per site, and it compares the sites with a water hookup against the connection test while stating that whether each hookup is one service connection is not verified in our research. Partial-hookup sites have no category in any verified table, so a total that leaves them out says so.

Fixtures, traffic, roads and parking

Florida requires, per park, 1 toilet and 1 urinal for men and 2 toilets for women, with the same set repeated for each 25 non-self-contained spaces or fraction, and 1 dump station per 100 spaces or fraction, or 1 per 250 spaces or fraction when more than 50 percent of spaces have sewer hookups [5]. A full-hookup, self-contained-only park may file an exemption letter (64E-15.005(6)) [5]. The calculator counts the sites without a sewer hookup as the non-self-contained spaces, and says so. Michigan requires a sanitary station, and for a primitive campground 1 privy per sex plus a water outlet per 25 sites [10].

For traffic, the calculator multiplies the occupied sites by the ITE PM peak hour rate for land use 416, Campground/Recreational Vehicle Park: 0.27 trips per occupied campsite in the 11th Edition (2021), as a city fee table republishes it [21]. It is a published trip rate from a thin dataset of 6 studies, not a code requirement [22].

Road widths start from NFPA 1194, a model standard for recreational vehicle parks and campgrounds [23]. For roads designed for all camping unit types and sizes, it sets 10 ft per traffic lane and 8 ft per parallel parking lane, and roads leading to accessory structures need 20 ft of unobstructed width and 13.5 ft of vertical clearance [23]. Adopted codes set their own widths. Oregon sets 10 ft per traffic lane and 10 ft per parking lane on park streets used by the public [24]. Fruita, Colorado, which adopts NFPA 1194 by reference, requires 28 ft two-way roads and 20 ft one-way roads [25]. TxDOT's Table 4-1 gives the MH/B, a motor home with a boat trailer, a 49.8 ft design radius and a 35 ft inside radius [26]; which design vehicle should govern an RV park's loop roads is not stated there and is not verified in our research.

Michigan's campground rules require 1.5 parking spaces per site, on sites or in a separate lot [10]. Tucson requires 1 parking space per campsite [27], Houston's Sec. 26-492 does not codify the use [28], and Milwaukee's Table 295-403-2-a has no row for it [29]; the parking requirements lookup covers other city rules. The campground site plan and glamping site plan pages cover the tent and cabin side of a program.

The rules in the calculator

120 verified code values and 45 reference values, as researched on October 11, 2026. Each value is stored exactly as its source writes it, with its citation; reference values carry their label: a model standard, a secondary reproduction of a code table, agency guidance, a published trip rate or a figure observed in approvals.

Density caps and minimum park size

JurisdictionRuleValue as storedUnitConditionCitation
Alamosa County, ColoradoDensity cap8sites per acreon averageLUDC text amendment[8]
Alamosa County, ColoradoMinimum park size12acresminimum park sizeLUDC text amendment[8]
FloridaDensity cap25RV units per gross acremaximum, statewide; new or modified parks64E-15.002(3)(b)[5]
Duval County, FloridaDensity cap25self-contained spaces per acremaximum, temporary RV parksSec. 460.304 to 460.305[33]
Palm Bay, FloridaDensity cap15RV sites per gross acremaximumPalm Bay Code §174.045[6]
Palm Bay, FloridaMinimum park size10acresminimum park sizePalm Bay Code §174.045[6]
Sutherlin, OregonDensity cap22sites per acremaximum without density bonusSutherlin Municipal Code 12.40.090[7]
Sutherlin, OregonDensity cap25sites per acremaximum with density bonusSutherlin Municipal Code 12.40.090[7]
Sutherlin, OregonMinimum park size2acresminimum park sizeSutherlin Municipal Code 12.40.090[7]
Parker County, TexasMinimum park size5.0acre minimum tractminimum tract for an RV parkParker County Infrastructure Requirements for Recreational Vehicle Parks[9]
Parker County, TexasDensity cap60spaces maximum on a 5.0 acre tractmaximum on a 5.0 acre tractParker County Infrastructure Requirements for Recreational Vehicle Parks[9]

A statewide density cap is verified in our research for Florida only. The calculator computes a cap stated per acre; a cap stated for a tract, or for temporary parks, is shown as the code states it.

Site geometry and road widths

JurisdictionParameterValue as storedUnitConditionCitation
NationalTraffic lane width10 (model standard)ft per traffic laneroads designed for all camping unit types and sizesNFPA 1194 §5.1.2, NFPA 1194, 2021 ed.[23]
NationalParking lane width8 (model standard)ft per parallel parking laneroads designed for all camping unit types and sizesNFPA 1194 §5.1.2, NFPA 1194, 2021 ed.[23]
NationalRoad to accessory structures, width20 (model standard)ftunobstructed width, roads leading to accessory structuresNFPA 1194 §5.1.2.2, NFPA 1194, 2021 ed.[23]
NationalRoad to accessory structures, vertical clearance13.5 (model standard)ftvertical clearance, roads leading to accessory structuresNFPA 1194 §5.1.2.2, NFPA 1194, 2021 ed.[23]
NationalOne-way road width10 (model standard)ftone-way road, no parking lanes (derived from 10 ft per lane)NFPA 1194 §5.1.2, NFPA 1194, 2021 ed.[23]
NationalTwo-way road width20 (model standard)fttwo-way road, no parking lanes (derived from 10 ft per lane)NFPA 1194 §5.1.2, NFPA 1194, 2021 ed.[23]
Fruita, ColoradoMinimum site area1,500sfper spaceFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
Fruita, ColoradoMinimum site width25ftwide per spaceFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
Fruita, ColoradoCar pad20 x 9ftcar pad per spaceFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
Fruita, ColoradoRV pad35 x 12ftRV pad per spaceFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
Fruita, ColoradoSeparation between units10ftbetween unitsFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
Fruita, ColoradoTwo-way road width28fttwo-way roadsFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
Fruita, ColoradoOne-way road width20ftone-way roadsFruita Municipal Code Ch. 17.33 (17.33.030, 17.33.080)[25]
FloridaMinimum site area1,200sfper RV space; new or modified parks64E-15.002(3)(a) to (c)[5]
FloridaMinimum tent site area500sfper tent space; new or modified parks64E-15.002(3)(a) to (c)[5]
MichiganMinimum site area1,200sfminimum site area, all campgroundsR 325.1556(1)[10]
MichiganMinimum road frontage per site15ftminimum road frontage per siteR 325.1556(1)[10]
MichiganAccess to a roadmust abut a roadway unless a walk-in siteR 325.1556(1)[10]
MichiganClear path around each unit4ftunobstructed path completely around each unit, measured outside sheds and awnings (slide-outs and awnings)R 325.1556(4)[10]
MichiganRoad right-of-way20ftminimum road right-of-way, all campgroundsR 325.1558(1)[10]
MichiganParking per site1.5spaces per siteon sites or in a separate lotR 325.1558(2)[10]
OregonTraffic lane width10ft per traffic laneminimum; park streets used by the publicOAR 918-650-0045(4)[24]
OregonParking lane width10ft per parking lanepark streets used by the publicOAR 918-650-0045(4)[24]
OregonSeparation between units10ftfrom other camping vehicles or tents, buildings, and awnings or carports on adjacent spacesOAR 333-031[34]
OregonSetback from a street boundary10ftfrom boundary on a public streetOAR 333-031[34]
OregonSetback from other property lines5ftfrom other property linesOAR 333-031[34]
Parker County, TexasSeparation between units12ftat least, between RVs with slide-outs extendedParker County Infrastructure Requirements for Recreational Vehicle Parks[9]

Design flows

StateService and site typeValue as storedUnitConditionCitation
FloridaWastewater: full-hookup75gpdper vehicle space, transient RV park, overnight stay with water and sewer hookupRule 62-6.008(1) Table I[35]
FloridaWastewater: no-hookup50gpdper vehicle space, transient RV park, without water and sewer hookupRule 62-6.008(1) Table I[35]
FloridaWastewater: tenttent spaces fall under the RV space definition in 64E-15.001(9)not set separately: use the RV space flow64E-15.001(9)[5]
FloridaWastewater: park-modela park model counts as an RV space under 64E-15.001(9)not set separately: use the RV space flow64E-15.001(9)[5]
MichiganWastewater: full-hookup75galper site, water and sewer outlets at each site (table 1A states flows in gallons per day)Mich. Admin. Code R 325.1561(2)(a) to (d)[10]
MichiganWastewater: no-hookup75galper site, sites served by service buildings (table 1A states flows in gallons per day)Mich. Admin. Code R 325.1561(2)(a) to (d)[10]
MichiganWastewater: primitive30gpdper primitive site operated with a modern campgroundMich. Admin. Code R 325.1561(2)(a) to (d)[10]
MichiganWastewater: park-model150galper park model site, also single-sectional mobile homes (table 1A states flows in gallons per day)Mich. Admin. Code R 325.1561(2)(a) to (d)[10]
MichiganWastewater: cabinCamping cabins (under 400 sf, no water connection) carry no separate flow (agency guidance)resort cabins with fixtures need EGLE evaluationEGLE cabin guidance Rev. 8/2025[31]
MichiganWater: park30gpmminimum well delivery for the campground, unless the per-connection sum is higherR 325.1559(1) to (2)[10]
MichiganWater: park-model1gpmper park model or mobile home connection, summed with the other site connections; applies when the sum is higher than the 30 gpm minimumR 325.1559(1) to (2)[10]
MichiganWater: other-site0.5gpmper other site connection, summed with the park model connections; applies when the sum is higher than the 30 gpm minimumR 325.1559(1) to (2)[10]
North CarolinaWastewater: full-hookup (onsite-18E)100galper space, travel trailer or RV in an RV park (table 1A states flows in gallons per day)15A NCAC 18E .0401 Table II[17]
North CarolinaWastewater: no-hookup (onsite-18E)70galper campsite, bathhouse for campsites and RV sites with no water and sewer hookups, max 4 people15A NCAC 18E .0401 Table II[17]
North CarolinaWastewater: tent (onsite-18E)70galper campsite, same bathhouse category15A NCAC 18E .0401 Table II[17]
North CarolinaWastewater: park-model (onsite-18E)150galper space, recreational park trailer or park model trailer, 400 sf or less15A NCAC 18E .0401 Table II[17]
North CarolinaWastewater: full-hookup (non-discharge-02T)100galper campsite, campgrounds with water and sewer hookups (non-discharge permits)15A NCAC 02T .0114[18]
North CarolinaWastewater: no-hookup (non-discharge-02T)75galper campsite, with comfort station, no hookups (non-discharge permits)15A NCAC 02T .0114[18]
North CarolinaWastewater: tent (non-discharge-02T)75galper campsite (non-discharge permits)15A NCAC 02T .0114[18]
North CarolinaWastewater: dump-station (non-discharge-02T)50galper space, campground dump station facility (non-discharge permits)15A NCAC 02T .0114[18]
TexasWastewater: full-hookup50gpdper space (travel trailer/RV park), no water-saving devices30 TAC §285.91(3) Table III[16]
TexasWastewater: full-hookup40gpdper space (travel trailer/RV park), with water-saving devices30 TAC §285.91(3) Table III[16]
TexasWastewater: per-person15gpdper person, park with bathhouse, no water-saving devices (Texas sets no separate value for RV sites without hookup; tent sites use the same per-person rates)30 TAC §285.91(3) Table III[16]
TexasWastewater: per-person12gpdper person, park with bathhouse, with water-saving devices30 TAC §285.91(3) Table III[16]
TexasWastewater: per-person10gpdper person, park without bathhouse, no water-saving devices30 TAC §285.91(3) Table III[16]
TexasWastewater: per-person8gpdper person, park without bathhouse, with water-saving devices30 TAC §285.91(3) Table III[16]

Design flows not verified in our research: Alabama, Alaska, Arizona, Arkansas, California, Colorado, Connecticut, Delaware, District of Columbia, Georgia, Hawaii, Idaho, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maine, Maryland, Massachusetts, Minnesota, Mississippi, Missouri, Montana, Nebraska, Nevada, New Hampshire, New Jersey, New Mexico, New York, North Dakota, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, South Dakota, Tennessee, Utah, Vermont, Virginia, Washington, West Virginia, Wisconsin, Wyoming.

Review and water system thresholds

JurisdictionTestValue as storedUnitConditionCitation
NationalPublic water system: service connections15service connectionsat least: a public water system has at least 15 service connections40 CFR 141.2[20]
NationalPublic water system: persons served25individuals daily (average)at least: regularly serves an average of at least 25 individuals daily, at least 60 days a year40 CFR 141.2[20]
NationalPublic water system: days a year60days a yearat least 60 days a year, with the 25-individual test40 CFR 141.2[20]
NationalPublic water system classtransient non-community system (agency guidance)a campground is typically this class of public water system[30]
MassachusettsPublic water system: service connections15connections15 connectionsMassDEP guidance[36]
MassachusettsPublic water system: persons served25individuals daily25 individuals daily at least 60 daysMassDEP guidance[36]
MassachusettsPublic water system: days a year60daysat least 60 days, with the 25-individual testMassDEP guidance[36]
MassachusettsPublic water system: systems combinedMassDEP may aggregate commonly owned wellsMassDEP guidance[36]
MichiganConstruction permitAny campground construction or alteration needs an EGLE construction permitany construction or alterationMCL 333.12505[10]
MichiganEngineer-prepared plans$15,000project costabove: plans for projects costing more than $15,000 must be engineer-preparedR 325.1553(1)[10]
North CarolinaLocal health department approval1,500gpdup to: the local health department may approve RV park systems up to 1,500 gpd (about 15 RV spaces or 10 park model spaces)NCDHHS RV Parks Guidance (18E version)[19]
North CarolinaState review: design daily flow3,000gpdabove: state review is required above 3,000 gpd unreduced design daily flowNCDHHS RV Parks Guidance (18E version)[19]
North CarolinaState review: pretreatmentunapproved advanced pretreatmentstate review is required for unapproved advanced pretreatmentNCDHHS RV Parks Guidance (18E version)[19]
North CarolinaState review: dump-station wasteany system receiving dump-station wastestate review is required for any system receiving dump-station wasteNCDHHS RV Parks Guidance (18E version)[19]
NevadaPublic water system: service connections15service connections15 or moreNRS 445A.235[37]
NevadaPublic water system: persons served25personsregularly serves 25 or more personsNRS 445A.235[37]
TexasPublic water system test15/25/60the same 15 connection, 25 person, 60 day test as the federal floor30 TAC §290.38[32]
TexasPublic water system: systems combinedAdjacent systems under common ownership are combined30 TAC §290.38[32]
TexasTransient non-community water system: persons25personstransient non-community: 25 persons at least 60 days30 TAC §290.38[32]
TexasOn-site sewage facility program ceiling5,000gallons per daybelow: Chapter 285 OSSF rules apply to an RV park only with combined wastewater flow of less than 5,000 gallons per day; at 5,000 gpd or more the OSSF program does not apply30 TAC §285.2(59)[16]

Not verified in our research: which permit applies at or above the OSSF ceiling (Texas); a state-specific public water system threshold (Florida); the flow above which a state or large-system wastewater permit applies (Florida); a state-specific public water system threshold (North Carolina); a state-specific public water system threshold (California); the flow above which a state or large-system wastewater permit applies (California); the flow above which a state or large-system wastewater permit applies (Nevada); the flow above which a state or large-system wastewater permit applies (Massachusetts).

Fixtures, dump stations and water stations

JurisdictionFixtureValue as storedUnitConditionCitation
FloridaToilets1toiletminimum per park; same set repeated for each 25 non-self-contained spaces or fraction64E-15.004(5) to (7)[5]
FloridaUrinals1urinalminimum per park; same set repeated for each 25 non-self-contained spaces or fraction64E-15.004(5) to (7)[5]
FloridaToilets2toiletsminimum per park; same set repeated for each 25 non-self-contained spaces or fraction64E-15.004(5) to (7)[5]
FloridaLavatories1lavatory per sexminimum per park; same set per 25 non-self-contained spaces64E-15.004(5) to (7)[5]
FloridaDump stations1dump stationper 100 spaces or fraction64E-15.005(2) to (3)[5]
FloridaDump stations1dump stationper 250 spaces or fraction when more than 50 percent of spaces have sewer hookups64E-15.005(2) to (3)[5]
FloridaPotable water stations1potable water stationper 100 non-hookup spaces64E-15.003(3)(b)[5]
FloridaPotable water stations1potable water stationper 250 when more than 50 percent are hooked up64E-15.003(3)(b)[5]
FloridaBathhouse exemptionA full-hookup, self-contained-only park may file an exemption letterfull-hookup park serving self-contained units only64E-15.005(6)[5]
FloridaToilets1:10recreational camps; tents count as 2 people, split equally by gender64E-15.009(7)(a)[5]
FloridaToilets1:15recreational camps; tents count as 2 people, split equally by gender64E-15.009(7)(a)[5]
FloridaUrinals1:25recreational camps; tents count as 2 people, split equally by gender64E-15.009(7)(a)[5]
FloridaLavatories1:10recreational camps; tents count as 2 people, split equally by gender64E-15.009(7)(a)[5]
FloridaLavatories1:15recreational camps; tents count as 2 people, split equally by gender64E-15.009(7)(a)[5]
FloridaShowers1:15recreational camps; tents count as 2 people, split equally by gender64E-15.009(7)(a)[5]
Duval County, FloridaPortable toilets2portable toiletstemporary RV parks: per 25 spacesSec. 460.304 to 460.305[33]
Duval County, FloridaDump stations1dump stationtemporary RV parks: per 100 spacesSec. 460.304 to 460.305[33]
Duval County, FloridaWater stations1water stationtemporary RV parks: per 100 spacesSec. 460.304 to 460.305[33]
Palm Bay, FloridaDump stations1dump stationat least 1 dump stationCode §174.045[6]
Palm Bay, FloridaDump stations1additional dump station1 more per 50 non-sewered sites beyond the first 50Code §174.045[6]
Palm Bay, FloridaBathhouse fixtures2of each fixture per sexeach bathhouse, within 300 ft of non-hookup sites, at least 2 of each fixture per sexCode §174.045[6]
MichiganShowers1shower per sexshowers are optional; if provided, more than 250 sites need 1 per sex per 50 sites (fixture schedule applies to sites without water and sewer)R 325.1571(4), (5)[10]
MichiganShowers1showershowers are optional; if provided, more than 250 sites need 1 per 30 sites (unisex schedule)R 325.1571(4), (5)[10]
MichiganDump stationsA sanitary station is requiredR 325.1576[10]
MichiganPrivies1privy per sexprimitive campground: per 25 sites; privies at least 50 ft from sitesR 325.1556a(1)[10]
MichiganPrivies2unisex priviesprimitive campground: alternative to 1 privy per sex, per 25 sitesR 325.1556a(1)[10]
MichiganWater outletsa water outletprimitive campground: per 25 sitesR 325.1556a(1)[10]
MichiganPrivies1unisex privyprimitive areas of 10 sites or fewer may use 1 unisex privyR 325.1556a(1)[10]
MichiganPrivies1privy per sextemporary primitive campground (operation up to 4 weeks): per 25 sitesR 325.1555(2), R 325.1555a[10]
MichiganPrivies2unisex priviestemporary primitive campground (operation up to 4 weeks): per 30 sitesR 325.1555(2), R 325.1555a[10]
MichiganDump stations1sanitary stationtemporary campground (operation up to 4 weeks): 1 sanitary station requiredR 325.1555(2), R 325.1555a[10]
MichiganWater outlets1water outlettemporary campground (operation up to 4 weeks): per 50 sitesR 325.1555(2), R 325.1555a[10]
Sebewaing, MichiganToilets1toiletper 8 sites (local, stricter than state)§153.098[38]
Sebewaing, MichiganLavatories1sinkper 8 sites (local, stricter than state)§153.098[38]
OregonLavatories1additional lavatory per 2 toiletswhen more than 6 toilets are required: 1 additional lavatory per 2 toiletsOAR 918-650-0050 Table 3-RV (eff. 4/1/1988)[39]
OregonUrinals1/3of men's toiletsurinals may replace up to 1/3 of men's toiletsOAR 918-650-0050 Table 3-RV (eff. 4/1/1988)[39]
Sutherlin, OregonWashers1washerper 30 spacesSMC 12.40.090[7]
Sutherlin, OregonDryers1dryerper 30 spacesSMC 12.40.090[7]
Sutherlin, OregonSanitary fixture scheduleparks over 30 spaces follow OAR 918-650-0050parks over 30 spacesSMC 12.40.090[7]

No statewide fixture ratio verified in our research: Alabama, Alaska, Arizona, Arkansas, California, Colorado, Connecticut, Delaware, District of Columbia, Georgia, Hawaii, Idaho, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maine, Maryland, Massachusetts, Minnesota, Mississippi, Missouri, Montana, Nebraska, Nevada, New Hampshire, New Jersey, New Mexico, New York, North Carolina, North Dakota, Ohio, Oklahoma, Pennsylvania, Rhode Island, South Carolina, South Dakota, Tennessee, Texas, Utah, Vermont, Virginia, Washington, West Virginia, Wisconsin, Wyoming.

Electrical tables, as secondary reproductions

The NEC is a model code each state adopts by edition; which edition a state has adopted is not verified in our research. Every value below is labelled with the kind of source it comes from.

PartValue as storedUnitConditionEditionCitation
ReceptaclesRequired at each site with electrical supply (secondary reproduction of a code table)20 A, 125 V receptacle2014NEC 551.71(A)[40]
Receptacles70 (secondary reproduction of a code table)percent of all sites with electrical supplyminimum; 30 A, 125 V, weather-resistant, conforming to Figure 551.46(C)(1)2023NEC 551.71(B)[11]
Receptacles40 (secondary reproduction of a code table)percent of new sitesminimum, new sites; 50 A, 125/250 V2017 onward; carried in 2023NEC 551.71(C)[11]
Receptacles20 (secondary reproduction of a code table)percent of existing sitesminimum, existing sites; 50 A, 125/250 V2017 onward; carried in 2023NEC 551.71(C)[11]
Receptacles20 (secondary reproduction of a code table)percent of new sitesnew sites under NEC editions before 2017 (raised from 20 to 40 percent for new sites in the 2017 NEC)before 2017NEC 551.71(C)[12]
ReceptaclesEvery site with a 50 A receptacle must also have a 30 A, 125 V receptacle (secondary reproduction of a code table)2014 onwardNEC 551.71(C)[41]
ReceptaclesDedicated tent sites with 15 or 20 A supply may be excluded when computing the 30 A and 50 A percentages (secondary reproduction of a code table)applies to dedicated tent sites only2020 textNEC 551.71[13]
Receptacles100 (secondary reproduction of a code table)percent of sites (could approach)advisory informational note, not mandatory: the 50 A share could approach 100 percent in parks serving seasonal and large RVs2020 and 2023NEC 551.71 informational note[12]
Load per site12,000 (secondary reproduction of a code table)VA per site50 A site (208Y/120 or 120/240 V)2017 onward; 2023 confirmedNEC 551.73(A)[14]
Load per site9,600 (secondary reproduction of a code table)VA per site50 A site under NEC editions before 2017before 2017NEC 551.73(A)[14]
Load per site3,600 (secondary reproduction of a code table)VA per sitesite with both 20 A and 30 A2017 and 2023NEC 551.73(A)[14]
Load per site2,400 (secondary reproduction of a code table)VA per sitesite with 20 A only2017 and 2023NEC 551.73(A)[14]
Load per site600 (secondary reproduction of a code table)VA per sitededicated tent site with 20 A only2017 and 2023NEC 551.73(A)[14]
Load per siteCalculate only for the highest-rated receptacle (secondary reproduction of a code table)multiple receptacles at one site2023 textNEC 551.73(A)[15]
Demand factor noteDemand factors do not apply to bathhouses, recreation buildings, pools and similar loads (secondary reproduction of a code table)2017 onwardNEC 551.73(A)[14]
Demand factor notethe demand factor for a given number of sites applies to all sites indicated (secondary reproduction of a code table)NEC 551.73(B)[42]
Demand factor noteThe table sets the minimum allowable demand factors (secondary reproduction of a code table)NEC 551.73(B)[42]
Demand factor100 (secondary reproduction of a code table)percent1 RV siteNEC Table 551.73(A)[43]
Demand factor90 (secondary reproduction of a code table)percent2 RV sitesNEC Table 551.73(A)[43]
Demand factor80 (secondary reproduction of a code table)percent3 RV sitesNEC Table 551.73(A)[43]
Demand factor75 (secondary reproduction of a code table)percent4 RV sitesNEC Table 551.73(A)[43]
Demand factor65 (secondary reproduction of a code table)percent5 RV sitesNEC Table 551.73(A)[43]
Demand factor60 (secondary reproduction of a code table)percent6 RV sitesNEC Table 551.73(A)[42]
Demand factor55 (secondary reproduction of a code table)percent7 to 9 RV sitesNEC Table 551.73(A)[43]
Demand factor50 (secondary reproduction of a code table)percent10 to 12 RV sitesTable 551.73 reproduction, 2007 California Electrical CodeNEC Table 551.73(A)[43]
Demand factor48 (secondary reproduction of a code table)percent13 to 15 RV sitesTable 551.73 reproduction, 2007 California Electrical CodeNEC Table 551.73(A)[43]
Demand factor47 (secondary reproduction of a code table)percent16 to 18 RV sitesTable 551.73 reproduction, 2007 California Electrical CodeNEC Table 551.73(A)[43]
Demand factor45 (secondary reproduction of a code table)percent19 to 21 RV sitesNEC Table 551.73(A)[15]
Demand factor43 (secondary reproduction of a code table)percent22 to 24 RV sitesTable 551.73 reproduction, 2007 California Electrical CodeNEC Table 551.73(A)[43]
Demand factor42 (secondary reproduction of a code table)percent25 to 35 RV sitesNEC Table 551.73(A)[44]
Demand factor41 (secondary reproduction of a code table)percent36 and over RV sitesNEC Table 551.73(A)[14]

Densities observed in approvals

Observed in approvals, not a code limit, and not applied to the acreage: the density statistics and clusters in our research are computed over a set of approvals that includes machine-written meeting summaries, so they are not shown and the calculator estimates no site count from them. Each approval below rests on a primary document or carries its secondary label. 13 further approvals in the set are not shown: their outcome, their figures or their source could not be checked against a primary document in our research.

ProjectWhereValue as storedUnitCondition
Rhoades RV ParkUintah County, Utah22.2 (observed in approvals)[1]sites per gross acrePlanning Commission CUP, 6/18/2025, unanimous; 38 RV sites on 1.71 gross acres
West Atlantic RV Resort (ZV/SV/PDD-2024-01422)Palm Beach County, Florida12.0 (observed in approvals)[3]sites per gross acreZoning Commission hearing 5/1/2025, staff recommended approval; BCC land-use transmittal capped the site at 121 spaces; 113 RV plus 8 camping cabins on 10.11 gross acres (11.2 per acre RV only); the final BCC adoption date is unverified
Jantzer RV Park (201-00553-26)Grants Pass, Oregon14.9 (observed in approvals)[2]sites per gross acreUrban Area Planning Commission, major site plan approved 7-0 (re-review of a 2024 approval; packet dated 3/25/2026); 87 RV sites in two phases on 5.83 gross acres
Woods Hollow RV Park (APA P2022-0008)Town of Mayfield, Fulton County, New York3.3 (observed in approvals)[4]sites per gross acreAdirondack Park Agency, unanimous, 12/15/2022 (after county and town planning boards); 277 sites (RV, glamping and primitive) on 83.4 acres; agency figure 3.5
North Pasco ResortPasco County, Florida2.7 (observed in approvals)[45]sites per gross acresecondary source (trade press, not a county record): BCC 3-2, January 6, 2026; 350 RV on 131 gross acres that include a 250-room hotel (mixed use); per a second press report (Hernando Sun), the amendment cut RV spaces from 550 to 350

Trip rate and design vehicle

ItemValue as storedUnitCondition or editionCitation
Trip rate, land use 416, pm-peak0.27 (published trip rate)trips per occupied campsiteITE Trip Generation, 11th Edition (2021), as republished in the City of Phoenix, OR SDC table[21]

Campground parking

JurisdictionValue as storedUnitConditionCitation
Tucson, Arizona1per campsiteTravelers' Accommodation, CampsiteUDC Sec. 7.4.4, Table 7.4.4-1[27]
Michigan1.5spaces per siteon sites or in a separate lot; all campgroundsMich. Admin. Code R 325.1558(2)[10]
Tulsa, Oklahoma0.65per camping spaceCampgrounds and RV parks; all districts other than CBDTulsa Zoning Code Sec. 55.020, Table 55-1 (Ord. 25429, eff. 12/10/2024)[46]
Houston, Texasnot codifiedCode of Ordinances Sec. 26-492[28]
Milwaukee, Wisconsinnot codifiedTable 295-403-2-a[29]

Not verified in our research

Every rule our research holds for these counties and cities is withheld, so the calculator applies only their state's rules there:

  • Phoenix, Arizona
  • Los Angeles, California
  • Jacksonville, Florida
  • Louisiana parish (jurisdiction unverified), Louisiana
  • Nye County, Nevada
  • Dallas, Texas
  • Fort Worth, Texas
  • San Antonio, Texas
  • Utah county (jurisdiction name not shown in document), Utah
  • Clallam County, Washington

Not set in any code our research retrieved, so the calculator sizes none of them:

  • Pad dimensions by RV class
  • Pull-through and back-in site lengths
  • A minimum turning radius set in a code
  • Industry dimensional guidance for pads

The NEC edition in force is not verified in our research for any state.

Worked examples

Computed by the calculator's own engine from the rows above when this page was built.

The published NEC worked example in North Carolina: full-hookup sites at twenty and thirty amps, against the state review threshold
Gross acres
4
State
NC
Full-hookup RV sites
20
Sites with a fifty amp receptacle, entered
0
Site mix
20 sites: 20 full-hookup RV sites
Observed density
No density observed in approvals is shown in our research, so the calculator estimates no site count from one; the site count is the mix entered, checked against any verified density cap.
Density cap
No density cap for this state or place is verified in our research, so the site count is not capped by a verified rule
20 A, 125 V receptacles
Required at each site with electrical supply (20 A, 125 V receptacle; 2014 text): 20 sites with electrical supply (NEC 551.71(A); secondary reproduction of a code table)
30 A, 125 V receptacles
Meets: At least 70 percent of all sites with electrical supply: 14 of 20, so at least 14 sites. This calculator gives every powered RV site a 30 A receptacle: 20 (NEC 551.71(B); secondary reproduction of a code table)
50 A, 125/250 V receptacles
Below the minimum: At least 40 percent of new sites (2017 onward; carried in 2023): 8 of 20, so at least 8 sites; 0 entered, which is below the minimum for new sites (NEC 551.71(C); secondary reproduction of a code table)
50 A sites
0 × 12,000 VA per site = 0 VA (50 A site (208Y/120 or 120/240 V); secondary reproduction of a code table)
20 A and 30 A sites
20 × 3,600 VA per site = 72,000 VA (site with both 20 A and 30 A; secondary reproduction of a code table)
Load before the demand factor
72,000 VA for 20 RV sites; Calculate only for the highest-rated receptacle (NEC 551.73(A); secondary reproduction of a code table)
Demand factor
19 to 21 RV sites: 45 percent (NEC Table 551.73(A); secondary reproduction of a code table)
Calculated load, site feeders and service
72,000 VA × 45 percent = 32,400 VA, or 1,620 VA per site (NEC Table 551.73(A); secondary reproduction of a code table)
Edition logic
Edition logic: NEC 551.71 and 551.73 as the cited reproductions state them, with the 50 A share and the 50 A load basis of 2017 onward; carried in 2023 (before that: 20 percent of new sites and 9,600 VA per site) (secondary reproduction of a code table) Which NEC edition a state or city has adopted is not verified in our research, so the edition logic is stated, not assumed.
15A NCAC 18E .0401 Table II
20 × 100 gal = 2,000 gallons per day (per space, travel trailer or RV in an RV park (table 1A states flows in gallons per day); 15A NCAC 18E .0401 Table II)
Design flow total, gallons per day
2,000 (15A NCAC 18E .0401 Table II)
15A NCAC 02T .0114
20 × 100 gal = 2,000 gallons per day (per campsite, campgrounds with water and sewer hookups (non-discharge permits); 15A NCAC 02T .0114)
Design flow total, gallons per day
2,000 (15A NCAC 02T .0114)
Public water system: service connections
Crossed: 20 sites with a water hookup reaches 15 service connections. The rule: a public water system has at least 15 service connections (40 CFR 141.2). Whether each site hookup counts as one service connection is not verified in our research
Public water system: persons served
Needs an input: 25 individuals daily (average) (regularly serves an average of at least 25 individuals daily, at least 60 days a year) (40 CFR 141.2): enter the persons per site to compare
Local health department approval
Crossed: 2,000 gallons per day (15A NCAC 18E .0401 Table II) is above 1,500 gpd. The rule: the local health department may approve RV park systems up to 1,500 gpd (about 15 RV spaces or 10 park model spaces) (NCDHHS RV Parks Guidance (18E version))
State review: design daily flow
Not crossed: 2,000 gallons per day (15A NCAC 18E .0401 Table II) is not above 3,000 gpd. The rule: state review is required above 3,000 gpd unreduced design daily flow (NCDHHS RV Parks Guidance (18E version))
PM peak hour trips
20 sites at 100 percent occupancy = 20 occupied sites × 0.27 trips per occupied campsite = 5.4 PM peak hour trips (published trip rate, ITE Trip Generation, 11th Edition (2021), as republished in the City of Phoenix, OR SDC table)
Not verified in our research
Statewide fixture, dump-station and water-station ratios; A statewide density cap; The NEC edition in force; A density observed in approvals to estimate the site count from; A state-specific public water system threshold; Receptacle wording of the newest NEC editions;
A Florida park entered above the statewide density cap
Gross acres
4
State
FL
Full-hookup RV sites
120
Site mix
120 sites: 120 full-hookup RV sites
Observed density
No density observed in approvals is shown in our research, so the calculator estimates no site count from one; the site count is the mix entered, checked against any verified density cap.
Density cap, Florida
Binds: 4 acres × 25 RV units per gross acre (maximum, statewide; new or modified parks) = 100, so at most 100 whole sites (64E-15.002(3)(b))
Density cap
Capped: the mix entered has 120 sites, and the Florida statewide cap allows at most 100 on 4 gross acres (25 RV units per gross acre, 64E-15.002(3)(b))
Minimum site area, Florida
120 RV sites × 1,200 sf = 144,000 sq ft, 82.64 percent of the 174,240 sq ft gross area, before roads and amenities (64E-15.002(3)(a) to (c))
20 A, 125 V receptacles
Required at each site with electrical supply (20 A, 125 V receptacle; 2014 text): 120 sites with electrical supply (NEC 551.71(A); secondary reproduction of a code table)
30 A, 125 V receptacles
Meets: At least 70 percent of all sites with electrical supply: 84 of 120, so at least 84 sites. This calculator gives every powered RV site a 30 A receptacle: 120 (NEC 551.71(B); secondary reproduction of a code table)
50 A, 125/250 V receptacles
Meets: At least 40 percent of new sites (2017 onward; carried in 2023): 48 of 120, so at least 48 sites; 48 used, the minimum, since none was entered (NEC 551.71(C); secondary reproduction of a code table)
50 A sites
48 × 12,000 VA per site = 576,000 VA (50 A site (208Y/120 or 120/240 V); secondary reproduction of a code table)
20 A and 30 A sites
72 × 3,600 VA per site = 259,200 VA (site with both 20 A and 30 A; secondary reproduction of a code table)
Load before the demand factor
835,200 VA for 120 RV sites; Calculate only for the highest-rated receptacle (NEC 551.73(A); secondary reproduction of a code table)
Demand factor
36 and over RV sites: 41 percent (NEC Table 551.73(A); secondary reproduction of a code table)
Calculated load, site feeders and service
835,200 VA × 41 percent = 342,432 VA, or 2,853.6 VA per site (NEC Table 551.73(A); secondary reproduction of a code table)
Edition logic
Edition logic: NEC 551.71 and 551.73 as the cited reproductions state them, with the 50 A share and the 50 A load basis of 2017 onward; carried in 2023 (before that: 20 percent of new sites and 9,600 VA per site) (secondary reproduction of a code table) Which NEC edition a state or city has adopted is not verified in our research, so the edition logic is stated, not assumed.
Rule 62-6.008(1) Table I
120 × 75 gpd = 9,000 gallons per day (per vehicle space, transient RV park, overnight stay with water and sewer hookup; Rule 62-6.008(1) Table I)
Design flow total, gallons per day
9,000 (Rule 62-6.008(1) Table I)
Public water system: service connections
Crossed: 120 sites with a water hookup reaches 15 service connections. The rule: a public water system has at least 15 service connections (40 CFR 141.2). Whether each site hookup counts as one service connection is not verified in our research
Public water system: persons served
Needs an input: 25 individuals daily (average) (regularly serves an average of at least 25 individuals daily, at least 60 days a year) (40 CFR 141.2): enter the persons per site to compare
Toilets, men
0 sites without a sewer hookup ÷ 25 = 0; at least one set per park; × 1 toilet = 1 (minimum per park; same set repeated for each 25 non-self-contained spaces or fraction; 64E-15.004(5) to (7))
Urinals, men
0 sites without a sewer hookup ÷ 25 = 0; at least one set per park; × 1 urinal = 1 (minimum per park; same set repeated for each 25 non-self-contained spaces or fraction; 64E-15.004(5) to (7))
Toilets, women
0 sites without a sewer hookup ÷ 25 = 0; at least one set per park; × 2 toilets = 2 (minimum per park; same set repeated for each 25 non-self-contained spaces or fraction; 64E-15.004(5) to (7))
Lavatories, each sex
0 sites without a sewer hookup ÷ 25 = 0; at least one set per park; × 1 lavatory per sex = 1 (minimum per park; same set per 25 non-self-contained spaces; 64E-15.004(5) to (7))
Dump stations
120 sites ÷ 250 = 0.48, counted up to 1 (or fraction); × 1 dump station = 1 (per 250 spaces or fraction when more than 50 percent of spaces have sewer hookups; 64E-15.005(2) to (3))
Bathhouse exemption
Applies: A full-hookup, self-contained-only park may file an exemption letter (64E-15.005(6)): every site entered is a full-hookup site, so the exemption can be filed if the park serves self-contained units only
PM peak hour trips
120 sites at 100 percent occupancy = 120 occupied sites × 0.27 trips per occupied campsite = 32.4 PM peak hour trips (published trip rate, ITE Trip Generation, 11th Edition (2021), as republished in the City of Phoenix, OR SDC table)
Not verified in our research
The NEC edition in force; A density observed in approvals to estimate the site count from; A state-specific public water system threshold; The flow above which a state or large-system wastewater permit applies; Receptacle wording of the newest NEC editions; Ratio for showers;

What the calculator leaves out

Our research verified per-site design flows for Texas, Michigan, North Carolina and Florida, whose flows come from the rule text of 62-6.008 opened for this edition. For every other state the calculator reports the design flow as not verified in our research and computes no total. Fixture ratios are verified statewide for Florida and Michigan, in part for Oregon, and for a few counties and cities; for Texas, North Carolina and the other states they are not verified in our research.

The public water system class is stated, not computed: a campground is typically a transient non-community system [30]. Cabins are not an input either; in Michigan, camping cabins under 400 sf with no water connection carry no separate flow, and resort cabins with fixtures need EGLE evaluation [31].

Which NEC edition each state has adopted is not verified in our research, and neither is the text of the newest edition of 551.71 and 551.73. No state code in our research sets pad dimensions by RV class, pull-through or back-in lengths or a minimum turning radius, so the calculator sizes none of them.

No density observed in approvals is applied to the acreage: the statistics and clusters in our research rest in part on machine-written meeting summaries, so they are not shown, and the approvals shown are evidence, not a code limit. A cap, a minimum park size or a fixture ratio the calculator does not list for a county or city is not verified in our research, which is not the same as no rule. The result is a preliminary estimate for a site plan; the engineer of record sizes the electrical service, the wastewater system and the roads, and the RV park regulations by state guide covers the approval path.

Frequently asked questions

How many RV sites fit on an acre?

It depends on the code and the program. Florida caps RV parks at 25 RV units per gross acre [5], Palm Bay at 15 RV sites per gross acre [6] and Alamosa County at 8 sites per acre on average [8]. Approved parks vary widely: Grants Pass approved Jantzer RV Park with 87 RV sites on 5.83 gross acres, or 14.9 per acre [2], and the Adirondack Park Agency approved Woods Hollow RV Park with 277 sites on 83.4 acres, or 3.3 per acre [4].

What electrical service does an RV park need?

NEC 551.71 requires 30 A receptacles at 70 percent of electrified sites and 50 A receptacles at 40 percent of new sites, with every 50 A site also carrying a 30 A receptacle [11]. Under 551.73(A) the load is calculated at 12,000 VA per 50 A site and 3,600 VA per site with both 20 A and 30 A, and Table 551.73(A) demand factors fall from 100 percent at 1 site to 41 percent at 36 or more sites [14].

How much wastewater does an RV park generate?

Design flows are set state by state. Texas uses 50 gpd per space, or 40 gpd with water-saving devices [16]. Michigan uses 75 gal per site for sites with water and sewer outlets [10]. North Carolina's 18E table uses 100 gal per RV space and 150 gal per park model space [17].

When does an RV park need state wastewater review in North Carolina?

State review is required above 3,000 gpd unreduced design daily flow, for unapproved advanced pretreatment or for any system receiving dump-station waste, and the local health department may approve RV park systems up to 1,500 gpd [19]. At 100 gpd per space, an NC park crosses into state review at about 30 full-hookup sites [17, 19].

Is an RV park a public water system?

Under the federal test, a system with at least 15 service connections, or one that regularly serves an average of at least 25 individuals daily at least 60 days a year, is a public water system [20]. Texas applies the same 15/25/60 test and combines adjacent systems under common ownership [32].

How many PM peak hour trips does an RV park generate?

The ITE rate for land use 416, Campground/Recreational Vehicle Park, is 0.27 PM peak hour trips per occupied campsite in the 11th Edition (2021), as republished in a city fee table [21]. At 0.27 PM per occupied site, an RV resort needs about 370 occupied sites to reach 100 PM peak trips [21, 22].

How wide do RV park roads need to be?

Road widths start from NFPA 1194, a model standard for recreational vehicle parks and campgrounds [23]. For roads designed for all camping unit types and sizes, it sets 10 ft per traffic lane and 8 ft per parallel parking lane [23]. Adopted codes vary: Fruita, Colorado, which adopts NFPA 1194 by reference, requires 28 ft two-way roads and 20 ft one-way roads [25], and Michigan requires a 20 ft minimum road right-of-way [10].

Sources

  1. 1)Uintah County Planning Commission minutes, Rhoades RV Park conditional use permit, Uintah County, on the Utah Public Notice Website. Accessed 2026-10-11.
  2. 2)Urban Area Planning Commission meeting minutes and packet, March 25, 2026 (Jantzer RV Park, 201-00553-26), City of Grants Pass. Accessed 2026-10-11.
  3. 3)West Atlantic RV Resort Staff Report, Palm Beach County Zoning Commission. Accessed 2026-10-11.
  4. 4)Woods Hollow RV Park (P2022-0008), comment response, Adirondack Park Agency. Accessed 2026-10-11.
  5. 5)Chapter 64E-15, F.A.C., Mobile Home, Lodging, and Recreational Vehicle Parks and Recreational Camps (2018 version), Florida Department of Health. Accessed 2026-10-11.
  6. 6)Code of Ordinances § 174.045, Recreational Vehicle Parks, City of Palm Bay. Accessed 2026-10-11.
  7. 7)Municipal Code Chapter 12.40, Recreational Vehicle Parks and Campgrounds, City of Sutherlin. Accessed 2026-10-11.
  8. 8)Alamosa County Text Amendments to the Land Use Development Code TA 25-001, Alamosa County. Accessed 2026-10-11.
  9. 9)Parker County Infrastructure Requirements for Recreational Vehicle Parks, Parker County. Accessed 2026-10-11.
  10. 10)Campground rules, Part 125 of Act 368 (R 325.1551 and following), Michigan Department of Environment, Great Lakes, and Energy. Accessed 2026-10-11.
  11. 11)551.71(A)(B)(C)(F) Receptacle Requirements at RV Parks. Accessed 2026-10-11.
  12. 12)Type Receptacles Provided (Recreational Vehicle Parks). Accessed 2026-10-11.
  13. 13)Article 551. Accessed 2026-10-11.
  14. 14)Sizing RV-Park Electrical Services Using NEC Table. Accessed 2026-10-11.
  15. 15)Attachment 15. Accessed 2026-10-11.
  16. 16)30 TAC Chapter 285, On-Site Sewage Facilities, Texas Commission on Environmental Quality. Accessed 2026-10-11.
  17. 17)15A NCAC 18E .0401, Design daily flow, North Carolina Office of Administrative Hearings. Accessed 2026-10-11.
  18. 18)15A NCAC 02T .0114, Wastewater design flow rates, North Carolina Office of Administrative Hearings. Accessed 2026-10-11.
  19. 19)RV Parks Guidance (18E version), North Carolina Department of Health and Human Services. Accessed 2026-10-11.
  20. 20)40 CFR 141.2, Definitions, Electronic Code of Federal Regulations. Accessed 2026-10-11.
  21. 21)ITE Trip Generation Manual, 11th Edition (system development charge table), City of Phoenix, Oregon. Accessed 2026-10-11.
  22. 22)Land Use: 416 Campground/Recreational Vehicle Park Description (CUP2024-00005), Whatcom County. Accessed 2026-10-11.
  23. 23)Standard for Recreational Vehicle Parks and Campgrounds, NFPA 1194, 2021 edition (preview), National Fire Protection Association. Accessed 2026-10-11.
  24. 24)OAR chapter 918, division 650, Oregon Secretary of State. Accessed 2026-10-11.
  25. 25)Municipal Code Chapter 17.33, Campgrounds and Recreational Vehicle Parks, City of Fruita. Accessed 2026-10-11.
  26. 26)Roadway Design Manual 4.3.3, Control Vehicles, Texas Department of Transportation. Accessed 2026-10-11.
  27. 27)Unified Development Code Sec. 7.4.4, Required Number of Motor Vehicle Parking Spaces, City of Tucson. Accessed 2026-10-11.
  28. 28)Code of Ordinances Sec. 26-492, parking requirements, City of Houston, Planning and Development Department. Accessed 2026-10-11.
  29. 29)Code of Ordinances Ch. 295, subchapter 4 (s. 295-403, Table 295-403-2-a), City of Milwaukee, Office of the City Clerk. Accessed 2026-10-11.
  30. 30)Introduction to the Safe Drinking Water Act and its requirements (presentation), U.S. Environmental Protection Agency. Accessed 2026-10-11.
  31. 31)Cabins and Park Models in Campgrounds (Rev. 8/2025), Michigan Department of Environment, Great Lakes, and Energy. Accessed 2026-10-11.
  32. 32)What is a Public Water System?, Texas Commission on Environmental Quality. Accessed 2026-10-11.
  33. 33)Sec. 460.301. Temporary Recreation Vehicle (RV) park .... Accessed 2026-10-11.
  34. 34)Oregon Secretary of State Administrative Rules. Accessed 2026-10-11.
  35. 35)Rule 62-6.008. Accessed 2026-10-12.
  36. 36)Determining if a water system is public or private. Accessed 2026-10-11.
  37. 37)Definitions and Regulations. Accessed 2026-10-11.
  38. 38)§ 153.098 RECREATIONAL VEHICLE PARK, CAMPGROUND.. Accessed 2026-10-11.
  39. 39)Table 3-RV Sanitary Facilities (918-650-0050. Accessed 2026-10-11.
  40. 40)Recreational Vehicles and RV Parks. Accessed 2026-10-11.
  41. 41)Quantity and Types of Receptacles at RV Parks. Accessed 2026-10-11.
  42. 42)post 2715909. Accessed 2026-10-11.
  43. 43)551.74 ARTICLE 551- RECREATIONAL VEHICLES AND RECREATIONAL VEHICLE PARKS. Accessed 2026-10-11.
  44. 44)RV Park Demand Calculation (551.73). Accessed 2026-10-11.
  45. 45)Woodall's, Jan. 13, 2026. Accessed 2026-10-11.
  46. 46)Tulsa Zoning Code Sec. 55.020, Table 55-1 as amended by Ord. 25429. Accessed 2026-10-12.

Rules as researched on October 11, 2026. Each row of the table carries its own date.

Start a project with these numbers

Send the site and the program. The studio reads your inputs and the result above with the brief, and replies to scope the preliminary site plan.