Tools / Car wash

Car wash site and stacking calculator

Pick the jurisdiction, how the wash runs and the category its code uses, then enter the tunnels or bays and the arrivals you design for. The calculator gives a preliminary estimate of the code stacking minimum, the 95th-percentile queue from a single-server queue, the PM peak hour trips, and the traffic study and turn-lane rules the rows verify.

Estimate the stacking

How this works

A stacking lane holds the cars waiting to enter the wash, and in nearly every code our research reviewed it is set as a fixed count of spaces. Lynnwood requires 2 per wash bay plus the vehicle in the bay, with 1 space beyond the bay, or 3 if hand drying or detailing, under LMC 21.18.810 [1]. Pompano Beach requires 4 per bay for an automatic car wash under Table 155.5101.G.8.a [2], and Maricopa requires 4 per bay for an automated or self-service wash and a minimum of 8 for a full-service wash under MCC 18.120.090 [3]. A preliminary site plan carries that count in its site data, against the stacking the layout provides.

Choose the jurisdiction and the category its code uses, and the calculator reads that one row. Texas City requires 3 per self-service drive-through or automated bay, plus the bay, and 7 for a full-service wash, a vacuum lane or a pump lane under §160.081(C) [4]. Cedar Hill requires 3 per automated bay plus the bay, and 4 per lane for a full-service wash [5]. Houston counts 2.5 spaces per bay or stall for stacking at an automated wash and 1 per bay at any other car wash under Sec. 26-492, Class 9 [6]. Philadelphia's Table 14-805-1 sets 6 stacking spaces for a full-service car wash [7]. Where a row says per bay or per lane, the calculator multiplies it by the bays or lanes entered; where it states a count, the calculator shows that count and does not multiply it. The car wash site plan page shows how the stacking lane shapes the rest of the layout.

Which category a conveyor tunnel or an in-bay automatic falls in is set by each code's own definitions, which our research did not verify, so the calculator asks for the category in the code's words and never assigns one.

The queue estimate

Fixed counts are the usual rule, but where a code or a reviewer asks for an analysis, the measure is the 95th-percentile queue. An approved transportation impact study for a car wash in Pittsburg, California states: "The 95th-percentile queue is generally applied as the acceptable limit for on-site circulation impacts" [8]. TxDOT's manual defines the 95th-percentile queue as the queue with "a five percent probability of being exceeded" [9].

The calculator models each tunnel, bay or lane as a single-server queue (M/M/1) and splits the design arrivals evenly among the wash lines. Utilization is the arrival rate at one line divided by its service rate. In that queue, the chance of more than n vehicles at the line is the utilization raised to the power n plus one, so the 95th-percentile queue is the smallest whole n for which that chance is five percent or less, the definition TxDOT's manual gives [9]. When arrivals reach or pass the service rate, utilization is one or more and the queue has no steady state: it grows without bound at that rate, and the calculator says so instead of giving a figure. The count includes the vehicle being served, so where a code counts its stacking spaces plus the bay, the estimate holds one vehicle the code counts separately.

The service rate matters more than any other input. In the Pittsburg study, the operator put the tunnel at about 60 vehicles per hour, 1 vehicle per minute, with no tunnel length stated [8], and the calculator uses that operating rate, labelled observed in approvals, unless you enter your own. An equipment design calculation sheet puts nominal capacity at the tunnel length in feet per hour, 100 per hour for a 100 ft tunnel, at a standard conveyor speed of tunnel length divided by 150 seconds, with a 17 ft vehicle [10]. The calculator shows that manufacturer figure beside the estimate and never sizes the queue to it. No row gives a service rate for an in-bay automatic or a self-serve bay, so for those the queue needs the rate you expect the bay to serve.

One study in our research gives queues observed at working washes, and the calculator shows it beside a tunnel estimate, labelled observed in approvals. A traffic evaluation dated 11/26/2025, filed for a car wash in West Town, Pennsylvania, reports an average peak queue of 16 vehicles on a Saturday midday, observed at 4 sites in Maryland and Virginia with 5-minute observations, not at the West Town site [11]. The express car wash in Mansfield, Texas and the express car wash in Hillsborough County, Florida case studies show stacking lanes drawn for that kind of demand.

Space size and lane length

Codes size each stacking space as well as counting them. Lynnwood's space is 20 ft x 10 ft, 12 ft wide on curves [1]; Texas City's is 8 ft x 20 ft [4], and Cedar Hill's the same [5]; Pompano Beach's is 9 ft x 18 ft [2]; and Maricopa's is a 12 ft x 20 ft aisle [3]. Philadelphia sets a 10 ft minimum lane width, a 20 ft setback of the stacking lane from property lines, and a raised median, curb or landscape between stacking and bypass lanes [7]. Where the jurisdiction's space size is verified, the calculator multiplies the 95th-percentile queue by the space length to give the stacking lane in feet per wash line. The Texas car wash site plan and Florida car wash site plan pages cover the state approval paths around that lane.

Trips, traffic studies and turn lanes

ITE's 11th Edition counts an automated car wash, land use 948, by its tunnels, and a traffic memo filed in California states that "ITE does not have an ADT rate or AM Peak Hour trip rate for Land Use Code 948" [12]. A car wash trip generation memo filed with Lee's Summit, Missouri, reports 78 PM peak trips for one tunnel and notes that AM and daily are not provided [13]. The calculator multiplies that rate by the tunnels entered and labels it with its edition. A self-serve wash is counted per wash stall under land use 947, at 5.54 PM peak trips per stall, a value the 10th and 9th Editions share [14]; no row gives a rate per in-bay automatic, so none is computed for one.

Traffic study thresholds are set by each state's transportation department for access to its highways, and the calculator shows the rows of the jurisdiction's state. Arizona's TGP 240 calls for a traffic impact analysis at 100 or more trips in any one hour, Category I from 100 to under 500 and Category II at 500 or more, and a traffic statement under 100, including turn-lane analysis per TGP 245/430 [15]. Pennsylvania's policy of 6/4/2025 sets 3,000 or more trips per day, or 150 or more entering or exiting in any one hour [16]. Minnesota recommends a study at 250 or more peak-hour trips or 2,500 new daily trips [17]. Texas has no single statewide trip threshold, and TxDOT's Access Management Manual says its scenarios "should not be used as thresholds" [18]; the TxDOT Houston District calls for a major study at 150 or more peak-hour trips or 1,500 or more daily trips [19].

The calculator compares its PM peak estimate only with a trigger that counts trips in a peak hour or in any one hour, and states every other trigger as written. At 78 PM peak trips, one tunnel stays below Arizona's 100-trip line [13, 15]. Turn-lane warrants count turning vehicles at a driveway, which the calculator does not estimate. Arizona's TGP 245 sets right-turn lanes by advancing volume: for 1 lane at 45 mph or more, 30 vph at 201 to 300 advancing, falling to 3 at over 1,400 [20]. Left-turn lanes are warranted at 30 vph under 45 mph, or 15 at 45 mph or more, when advancing volume is under 200 [20]. The calculator shows those rows as stated.

Where a city's parking table names a car wash, the calculator adds it by the code's own condition: Houston requires 2.5 per bay or stall for stacking at an automated wash and 1.0 per bay or stall for all other car washes [6]. The parking requirements lookup holds the same rows beside other uses, and the car wash visualization page shows how a stacking lane reads in a rendered site plan.

The rows in the calculator

50 verified code values, each cited to the code, ordinance, statute or agency manual it comes from, and the reference figures beside them with their labels, as researched on October 11, 2026. A value is stored exactly as its source writes it; the calculator does the arithmetic.

Car wash stacking minimums by jurisdiction

JurisdictionCategory, in the code's wordsMinimum as storedUnitConditionCitation
Bloomington, IndianaAutomated car wash4stacking spaces per bay or laneUDO Table 4-12 (Amendment 23, 2019)[21]
Cedar Hill, TexasAutomated car wash3stacking spaces per automated bayplus the bayZoning Art. 5 (m)[5]
Cedar Hill, TexasFull-service car wash4stacking spaces per laneZoning Art. 5 (m)[5]
Houston, TexasAutomated car wash2.5stacking spaces per bay or stallCode Sec. 26-492, Class 9[6]
Houston, TexasOther car wash1stacking spaces per bayCode Sec. 26-492, Class 9[6]
Lynnwood, WashingtonAutomated car wash2stacking spaces per wash bayplus the vehicle in the bayLMC 21.18.810[1]
Lynnwood, WashingtonAutomated car wash: beyond the bay1spaces beyond the bayLMC 21.18.810[1]
Lynnwood, WashingtonAutomated car wash: beyond the bay3spaces beyond the bayif hand drying or detailingLMC 21.18.810[1]
Lynnwood, WashingtonSelf-serve car wash1stacking spaces per bayLMC 21.18.810[1]
Maricopa, ArizonaAutomated car wash4stacking spaces per bayMCC 18.120.090, Table 18.120.090.D[3]
Maricopa, ArizonaSelf-serve car wash4stacking spaces per bayMCC 18.120.090, Table 18.120.090.D[3]
Maricopa, ArizonaFull-service car wash8stacking spaces (minimum)MCC 18.120.090, Table 18.120.090.D[3]
Philadelphia, PennsylvaniaFull-service car wash6stacking spacesfull-service car washPhila. Code 14-805(2), Table 14-805-1[7]
Pompano Beach, FloridaAutomated car wash4stacking spaces per bayTable 155.5101.G.8.a[2]
Texas City, TexasAutomated car wash3stacking spaces per bayper self-service drive-through or automated bay, plus the bay§160.081(C)[4]
Texas City, TexasFull-service car wash7stacking spaces§160.081(C)[4]
Texas City, TexasVacuum lane7stacking spaces§160.081(C)[4]
Texas City, TexasOpen bay2stacking spaces§160.081(C)[4]

Spaces beyond the bay are stated, never added to the stacking count. A row that states a count without "per" is shown as the code states it and not multiplied.

Stacking space size and lane rules

JurisdictionDimensionAs storedUnitConditionCitation
Cedar Hill, TexasStacking space8 ft x 20 ftwidth x lengthZoning Art. 5 (m)[5]
Lynnwood, WashingtonStacking space20 ft x 10 ftlength x width12 ft wide on curvesLMC 21.18.810[1]
Maricopa, ArizonaStacking space12 ft x 20 ftwidth x length (aisle)MCC 18.120.090, Table 18.120.090.D[3]
Pompano Beach, FloridaStacking space9 ft x 18 ftwidth x lengthTable 155.5101.G.8.a[2]
South Elgin, IllinoisStacking space9 ft x 18 ftwidth x lengthUDO §156.08.I[22]
Texas City, TexasStacking space8 ft x 20 ftwidth x length§160.081(C)[4]
Tyler, TexasStacking space9 ft x 20 ftwidth x lengthUDC Sec. 10-389[23]
PhiladelphiaLane width10ft (minimum)Phila. Code 14-805(2), Table 14-805-1[7]
PhiladelphiaBypass separationraised median, curb or landscapeseparation of stacking lanes from bypass lanesPhila. Code 14-805(2), Table 14-805-1[7]
PhiladelphiaStacking lane setback20ft from property linesstacking lane setbackPhila. Code 14-805(2), Table 14-805-1[7]

Accessible parking stalls, every jurisdiction

DimensionAs storedConditionCitation
Car space width96 inmeasured to centerline of markings2010 ADA Standards 502.1, 502.2[24]
Van space width132 invan space2010 ADA Standards 502.2[24]
Access aisle width60 incar and van2010 ADA Standards 502.3.1[24]

Throughput and observed queues

The operating rate is the calculator's default service rate for a tunnel. The nameplate is shown beside it and never used to size the queue. The observed queues sit beside every tunnel estimate.

FigureAs storedConditionWhere and whatLabel
Nameplate100 cars per hour100 ft tunnel; capacity = tunnel length in ft at the standard conveyor speed; 17 ft vehicleUnited States; equipment design calculation sheet[10]manufacturer figure
Nameplate150 seconds (standard conveyor speed = tunnel length / 150 s)0.67 ft/s on a 100 ft tunnelUnited States; equipment design calculation sheet[10]manufacturer figure
Operating rate60 vehicles per hourabout 60 (1 vehicle per minute); tunnel length not statedPittsburg, California; approved TIS[8]observed in approvals
Observed queue16 vehicles (average peak queue)Saturday midday; 5-minute observations at the 4 sites, not at the West Town site4 sites in Maryland and Virginia (traffic evaluation filed in West Town, PA); traffic evaluation dated 11/26/2025[11]observed in approvals

Not verified in our research: the tunnel queue of the Pittsburg, California study, the queues observed at in-bay washes at fuel stations, and a further observed tunnel queue whose only source is a machine-written meeting summary.

Trip rates

ITE land usePeriodRate as storedEdition and sourceLabel
948PM peak hour78 trips per car wash tunnelITE Trip Generation, 11th Edition (2021), as republished in a car wash trip generation memo filed with the City of Lee's Summit, MO[13]published trip rate
947PM peak hour5.54 trips per wash stallITE Trip Generation, 11th Edition, as republished in the City of Phoenix, OR SDC table (same value in the 10th and 9th Editions)[14]published trip rate

Not verified in our research: daily, AM peak and Saturday rates for these land uses, and a rate per in-bay automatic.

Traffic study triggers in these states

State or districtStudyThreshold as storedConditionCitation and edition
ArizonaTIA Category I100 trips in any one hourCategory I: 100 to under 500ADOT TGP 240, Aug. 2021[15]
ArizonaTIA Category II500 trips in any one hourADOT TGP 240, Aug. 2021[15]
Arizonatraffic statement100 trips in any one hourunder 100: a traffic statement, including turn-lane analysis per TGP 245/430ADOT TGP 240, Aug. 2021[15]
MinnesotaTIS (recommended)250 peak-hour tripsrecommended thresholdMnDOT Access Management Manual, Ch. 5[17]
MinnesotaTIS (recommended)2,500 new daily tripsrecommended thresholdMnDOT Access Management Manual, Ch. 5[17]
PennsylvaniaTIS3,000 trips per dayCondition 1 (daily volume)Policies and Procedures for Transportation Impact Studies and Assessments, Condition 1, 6/4/2025 (SOL 494-25-07)[16]
PennsylvaniaTIS150 trips entering or exiting in any one hourCondition 2 (hourly volume)Policies and Procedures for Transportation Impact Studies and Assessments, Condition 2, 6/4/2025 (SOL 494-25-07)[16]
TexasNo single statewide trip threshold TxDOT Access Management Manual, Access Management Manual (2011)[18]
TxDOT Houston Districtmajor study150 peak-hour tripsTxDOT Houston District onlyHouston District Traffic Study Guidelines[19]
TxDOT Houston Districtmajor study1,500 daily tripsTxDOT Houston District onlyHouston District Traffic Study Guidelines[19]

Traffic study trigger not verified in our research for: Florida; Illinois; Indiana; Maryland; Washington; nor the lower tiers of the TxDOT Houston District guidelines, or Houston's own city trigger.

Turn-lane warrants in these states

StateTurn and laneWarrant as storedConditionCitationLabel
ArizonaRight turn, turn lane30 right turns per hour (vph)1 lane at 45 mph or more, advancing volume 201 to 300 (an example value from the table)TGP 245, Jan. 2019[20]Code or agency rule
ArizonaRight turn, turn lane3 right turns per hour (vph)1 lane at 45 mph or more, advancing volume over 1,400TGP 245, Jan. 2019[20]Code or agency rule
ArizonaRight turn, turn lane85 right turns per hour (vph)1 lane under 45 mph, advancing volume 401 to 500 (an example value from the table)TGP 245, Jan. 2019[20]Code or agency rule
ArizonaRight turn, turn lane5 right turns per hour (vph)1 lane under 45 mph, the lowest value as the table falls ("falling to 5"); the pack does not give the advancing volume for itTGP 245, Jan. 2019[20]Code or agency rule
ArizonaLeft turn, turn lane30 left turns per hour (vph)1 lane, under 45 mph, advancing volume under 200TGP 245, Jan. 2019[20]Code or agency rule
ArizonaLeft turn, turn lane15 left turns per hour (vph)1 lane, 45 mph or more, advancing volume under 200TGP 245, Jan. 2019[20]Code or agency rule
ArizonaLeft turn, turn lane12 left turns per hour (vph)at most higher advancing volumes (the pack does not list them)TGP 245, Jan. 2019[20]Code or agency rule
ArizonaTurns, dual turn lanes300 turns per hour (vph)dual lanes consideredTGP 245, Jan. 2019[20]agency guidance
TexasLeft turn, decelerationat all access points on non-traversable (raised) medians non-traversable (raised) medianAccess Management Manual, Table 2-3[25]agency guidance

Turn-lane warrants not verified in our research for: Florida; Illinois; Indiana; Maryland; Minnesota; Pennsylvania; Washington; nor the Texas right-turn deceleration and acceleration values.

Parking for a car wash

JurisdictionConditionRatio as storedUnitCitation
Houston, TexasAutomated2.5per bay or stall for stackingCode of Ordinances Sec. 26-492 Class 9(c), (d)[6]
Houston, Texasall other1.0per bay or stallCode of Ordinances Sec. 26-492 Class 9(c), (d)[6]

A car wash parking minimum is not verified in our research for the other jurisdictions in the calculator.

Jurisdictions not verified in our research

For these jurisdictions our research did not verify a car wash stacking count from the code itself, so the calculator reports the minimum as not verified in our research and still computes the queue and the trips.

  • South Elgin, Illinois
  • Calvert County, Maryland
  • Saint Paul, Minnesota
  • Dallas, Texas
  • Tyler, Texas
  • Most other large US cities

Worked examples

Computed by the calculator's own engine from the rows above when this page was built.

Maricopa, Arizona: an express tunnel at the operating rate observed in approvals
Jurisdiction
Maricopa, AZ (az-maricopa)
How the wash runs
Conveyor tunnel (tunnel)
The code's category
Automated car wash (car-wash-automated)
Tunnels, bays or lanes
1
Design arrival rate, vehicles per hour
45
Reading
Code stacking minimum 4 spaces (MCC 18.120.090, Table 18.120.090.D); estimated 95th-percentile queue 10 vehicles per wash line; 78 PM peak hour trips
Code stacking minimum
4 stacking spaces per bay × 1 = 4 stacking spaces, MCC 18.120.090, Table 18.120.090.D
Stacking space
12 ft x 20 ft, width x length (aisle)
The queue, step by step
  1. Arrivals at the wash line: 45 vehicles per hour
  2. Service rate: 60 vehicles per hour, the operating rate observed in approvals (Pittsburg, approved TIS)
  3. Utilization: 45 ÷ 60 = 0.75
  4. Chance of more than n vehicles at one wash line: (45 ÷ 60) to the power (n + 1)
  5. 95th percentile: the smallest whole n with that chance at or below 0.05; ln(0.05) ÷ ln(45 ÷ 60) minus one = 9.41, rounded up: n = 10 vehicles
Queue at the 95th percentile, vehicles per wash line
10
Stacking lane
10 vehicles × 20 ft, the length of the code's stacking space (12 ft x 20 ft, width x length (aisle)) = 200 ft of stacking lane per wash line
Against the code
The 95th-percentile queue of 10 vehicles per wash line is above the code minimum of 4 stacking spaces per bay
Observed queue, 4 sites in Maryland and Virginia (traffic evaluation filed in West Town, PA)
16 vehicles (average peak queue), observed in approvals
PM peak hour trips
1 × 78 trips per car wash tunnel (ITE LUC 948) = 78 PM peak hour trips
Trip rate edition
ITE Trip Generation, 11th Edition (2021), as republished in a car wash trip generation memo filed with the City of Lee's Summit, MO
Traffic study, Arizona
The PM peak estimate of 78 trips is below 100 trips in any one hour.
Traffic study, Arizona
The PM peak estimate of 78 trips is below 500 trips in any one hour.
Traffic study, Arizona
The PM peak estimate of 78 trips is under 100 trips in any one hour.
Not verified in our research
Parking minimum for a car wash; ITE LUC 948 daily rate; ITE LUC 948 AM peak rate; ITE LUC 948 Saturday rate;
Houston, Texas: in-bay automatics where arrivals outpace the wash
Jurisdiction
Houston, TX (tx-houston)
How the wash runs
In-bay automatic (in-bay)
The code's category
Automated car wash (car-wash-automated)
Tunnels, bays or lanes
2
Design arrival rate, vehicles per hour
30
Service rate entered, vehicles per hour
12
Reading
Code stacking minimum 5 spaces (Code Sec. 26-492, Class 9); utilization 1.25: the queue grows without bound
Code stacking minimum
2.5 stacking spaces per bay or stall × 2 = 5 stacking spaces, Code Sec. 26-492, Class 9
The queue, step by step
  1. Arrivals per wash line: 30 vehicles per hour ÷ 2 = 15 vehicles per hour, split evenly
  2. Service rate: 12 vehicles per hour, the rate entered
  3. Utilization: 30 ÷ 2 ÷ 12 = 1.25
  4. At a utilization of 1.25, vehicles arrive at least as fast as the wash serves them, so the queue grows without bound at that rate and no 95th-percentile queue exists
PM peak hour trips
No row gives a trip rate per in-bay automatic, so no PM peak estimate is computed.
Traffic study, Texas
Stated: no number to compare.
Traffic study, TxDOT Houston District
Not compared: no PM peak hour estimate.
Traffic study, TxDOT Houston District
Not compared: the tool estimates PM peak hour trips only.
Parking, Automated
2 bay or stall for stacking × 2.5 per bay or stall for stacking = 5 spaces
Parking, All other
2 bay or stall × 1.0 per bay or stall = 2 spaces
Not verified in our research
Stacking space size; Observed queues for a wash of this format (in-bay automatic); A trip rate per in-bay automatic; Traffic study trigger, TxDOT Houston District: minor study; Traffic study trigger, Houston; Turn-lane warrant, Texas: right turn, deceleration; Turn-lane warrant, Texas: right turn, acceleration;
Lynnwood, Washington: self-serve bays at a rate the user enters
Jurisdiction
Lynnwood, WA (wa-lynnwood)
How the wash runs
Self-serve bays (self-serve)
The code's category
Self-serve car wash (car-wash-self-serve)
Tunnels, bays or lanes
4
Design arrival rate, vehicles per hour
20
Service rate entered, vehicles per hour
8
Reading
Code stacking minimum 4 spaces (LMC 21.18.810); estimated 95th-percentile queue 6 vehicles per wash line; 22.16 PM peak hour trips
Code stacking minimum
1 stacking spaces per bay × 4 = 4 stacking spaces, LMC 21.18.810
Stacking space
20 ft x 10 ft, length x width
The queue, step by step
  1. Arrivals per wash line: 20 vehicles per hour ÷ 4 = 5 vehicles per hour, split evenly
  2. Service rate: 8 vehicles per hour, the rate entered
  3. Utilization: 20 ÷ 4 ÷ 8 = 0.63
  4. Chance of more than n vehicles at one wash line: (20 ÷ 4 ÷ 8) to the power (n + 1)
  5. 95th percentile: the smallest whole n with that chance at or below 0.05; ln(0.05) ÷ ln(20 ÷ 4 ÷ 8) minus one = 5.37, rounded up: n = 6 vehicles
Queue at the 95th percentile, vehicles per wash line
6
Stacking lane
6 vehicles × 20 ft, the length of the code's stacking space (20 ft x 10 ft, length x width) = 120 ft of stacking lane per wash line
Against the code
The 95th-percentile queue of 6 vehicles per wash line is above the code minimum of 1 stacking spaces per bay
PM peak hour trips
4 × 5.54 trips per wash stall (ITE LUC 947) = 22.16 PM peak hour trips
Trip rate edition
ITE Trip Generation, 11th Edition, as republished in the City of Phoenix, OR SDC table (same value in the 10th and 9th Editions)
Not verified in our research
Parking minimum for a car wash; Observed queues for a wash of this format (self-serve bays); ITE LUC 947 daily rate; ITE LUC 947 AM peak rate; State traffic study trigger (WA); State turn-lane warrants (WA);

What the calculator leaves out

The calculator shows a stacking minimum only where our research verified it from the code. Saint Paul, Dallas and Tyler have no car wash stacking count verified in our research, and Calvert County's queuing rule is a draft ordinance, not adopted, so the calculator lists all four as not verified in our research. South Elgin's code is in the table for its space size, but its car wash count is not verified in our research. Codes for most other large US cities were not retrieved in our research.

The queue is a model, not a count. The single-server queue assumes vehicles arrive at random and are served at random intervals; a conveyor serves at a steadier pace, so the model tends to give a longer queue than a model with fixed service times. The arrivals are the ones you design for, and the calculator does not estimate them. An in-bay automatic at a fuel station is its own case: no row verifies its queue or its service rate, and no trip rate per in-bay automatic is computed.

Trip rates move between editions. A traffic evaluation for an express car wash cites ITE 12th Edition (2025) and PennDOT Pub 282 (June 2025), because the observed rates were higher than ITE's [11]. The calculator's rates are the 11th Edition values as republished by agencies and studies, and the daily, AM peak and Saturday rates for land use 948 are not verified in our research.

Codes change, and a condition of approval or a reviewer's queuing analysis can require more stacking than the code minimum. The calculator reads every row as researched on October 11, 2026, and a car wash site plan should be checked against the code in force when the application is filed.

Frequently asked questions

How many stacking spaces does a car wash need?

It depends on the code. Pompano Beach requires 4 per bay for an automatic car wash [2], Texas City 3 per self-service drive-through or automated bay, plus the bay [4], and Lynnwood 2 per wash bay plus the vehicle in the bay [1]. Observed queues at express tunnels run longer: a 2025 traffic evaluation measured an average peak queue of 16 vehicles on a Saturday midday at 4 sites in Maryland and Virginia [11].

How many trips does an express car wash generate?

One tunnel generates 78 PM peak hour trips under ITE land use 948, 11th Edition, as reported in a memo filed with Lee's Summit, Missouri, which notes that AM and daily rates are not provided [13]. ITE does not have a daily or AM peak hour rate for that land use [12].

Does a car wash need a traffic impact study?

It depends on the state and the city. Arizona's threshold is 100 or more trips in any one hour [15], Pennsylvania's is 3,000 or more trips per day or 150 or more entering or exiting in any one hour [16], and Minnesota recommends a study at 250 or more peak-hour trips or 2,500 new daily trips [17]. One tunnel's PM peak estimate of 78 trips is below each of those hourly figures [13], but a car wash's Saturday peak is not covered by that rate, and the Saturday rate is not verified in our research.

How many cars per hour can a car wash tunnel handle?

An equipment design calculation sheet puts nominal capacity at the tunnel length in feet per hour, 100 per hour for a 100 ft tunnel; that is a manufacturer figure [10]. The approved Pittsburg, California study used an operating rate of about 60 vehicles per hour, 1 vehicle per minute, as the operator stated it [8].

What is a 95th-percentile queue?

It is the queue length with a five percent probability of being exceeded, as TxDOT's TSP Manual defines it [9]. The Pittsburg, California study states that the 95th-percentile queue is generally applied as the acceptable limit for on-site circulation impacts [8].

Sources

  1. 1)LMC 21.18.810, Stacking lanes for drive-through facilities, City of Lynnwood. Accessed 2026-10-11.
  2. 2)Table 155.5101.G.8.a, Minimum stacking spaces for drive-through and related uses, City of Pompano Beach. Accessed 2026-10-11.
  3. 3)MCC 18.120.090, Drive-in and drive-through facilities, including fast-food facilities, City of Maricopa. Accessed 2026-10-11.
  4. 4)Sec. 160.081, Off-street parking requirements, City of Texas City. Accessed 2026-10-11.
  5. 5)Zoning Article 5, Development standards, City of Cedar Hill. Accessed 2026-10-11.
  6. 6)Code of Ordinances Sec. 26-492, parking spaces for certain types of use classifications, City of Houston, Planning and Development Department. Accessed 2026-10-11.
  7. 7)Phila. Code 14-805(2), Table 14-805-1, City of Philadelphia. Accessed 2026-10-11.
  8. 8)Car wash transportation impact study, Pittsburg, California (CEQAnet 280706). Accessed 2026-10-11.
  9. 9)TSP Manual, 4.5.5 Queue Length, Texas Department of Transportation. Accessed 2026-10-11.
  10. 10)Tunnel water loads, equipment design calculation sheet for a 100 ft tunnel. Accessed 2026-10-11.
  11. 11)Traffic Evaluation 2025-11-26. Accessed 2026-10-11.
  12. 12)Car wash trip generation memo (CEQAnet 278793). Accessed 2026-10-11.
  13. 13)Car Wash Trip Generation Memo, City of Lee's Summit, Missouri, development services. Accessed 2026-10-11.
  14. 14)ITE Trip Generation Manual, 11th Edition, system development charge table, City of Phoenix, Oregon. Accessed 2026-10-11.
  15. 15)TGP 240, Traffic Impact Analysis and Statement, Arizona Department of Transportation. Accessed 2026-10-11.
  16. 16)Policies and Procedures for Transportation Impact Studies and Assessments (6/4/2025), Pennsylvania Department of Transportation. Accessed 2026-10-11.
  17. 17)Access Management Manual, Chapter 5, Minnesota Department of Transportation. Accessed 2026-10-11.
  18. 18)Access Management Manual: Engineering Study versus Traffic Impact Analysis (TIA), Texas Department of Transportation. Accessed 2026-10-11.
  19. 19)TxDOT Houston District Traffic Study Guidelines, Texas Department of Transportation, Houston District. Accessed 2026-10-11.
  20. 20)TGP 245, turn-lane guidelines, Arizona Department of Transportation. Accessed 2026-10-11.
  21. 21)UDO Table 4-12 (Amendment 23, 2019). Accessed 2026-10-11.
  22. 22)§ 156.08.I Vehicular Stacking Requirements. Accessed 2026-10-11.
  23. 23)Sec. 10-389. Drive-Through Stacking Requirements. Accessed 2026-10-11.
  24. 24)U.S. Access Board - Chapter 5: General Site and Building Elements. Accessed 2026-10-11.
  25. 25)Auxiliary Lanes. Accessed 2026-10-11.

Rules as researched on October 11, 2026. Each row of the table carries its own date.

Start a project with these numbers

Send the site and the program. The studio reads your inputs and the result above with the brief, and replies to scope the preliminary site plan.