Permit site plans / Pools

Pool permit site plans

A pool permit site plan places the pool on the lot and measures it to every property line, easement and power line. This page sets out what Florida county checklists and other departments ask it to show for in-ground and above-ground pools, and which counties take a site plan and which require a sealed survey.

Last reviewed

Okaloosa County, Florida
5 feet from the edge of the pool water to any side or rear property line [1]
Nassau County, Florida
No permit for an above-ground pool less than 24 inches deep holding no more than 5,000 gallons [2]
Miami Beach, Florida
A signed and sealed site survey on the residential pool checklist of 5.23.2024 [3]
Davie, Florida
A signed and sealed survey for a residential pool [4]

What a pool permit site plan shows

Miami Beach's residential pool checklist, dated 5.23.2024, puts the requirement in one sentence: "Site Plan must show setbacks, both existing and proposed structures, property lines, lot dimensions, and grade elevation as per survey." [3] Other Florida departments add their own items. Hillsborough County wants the plan to identify all easements, conservation and wetland areas and setbacks, and to state that no trees will be removed to build the improvements [5]. Nassau County wants the location and dimensions of the pool with the setbacks from the pool to each property line, and any easements or overhead or underground power lines [2].

Read together, these checklists ask the pool site plan for:

Item on the planWho asks for it
Property lines and lot dimensionsMiami Beach [3]
Existing and proposed structuresMiami Beach [3]
The pool, located and dimensionedNassau [2]
Setbacks from the pool to each property lineNassau, Miami Beach and Hillsborough [2, 3, 5]
EasementsHillsborough and Nassau [5, 2]
Conservation and wetland areasHillsborough [5]
Overhead or underground power linesNassau [2]
Grade elevation, as per surveyMiami Beach [3]
A statement that no trees will be removed to build the improvementsHillsborough [5]
The distance to the structure, on each of three legible surveys or site plansIndian River, for above-ground pools [6]

Innowave Studio draws the pool site plan to the checklist of the department that will review it. The items every permit site plan carries are on the permit site plans hub.

Where each Florida checklist lives

Florida counties and cities publish their own pool documents, and the edition matters when you check a plan against one:

JurisdictionDocumentPools coveredEdition
Miami BeachPermit Checklist for Pool, Residential NewPool5.23.2024 [3]
DavieResidential Pool ChecklistPoolUndated [4]
Hillsborough CountyResidential Pool RequirementsPoolCurrent Florida Building Code [5]
Nassau CountyResidential Swimming Pool Plan Review ChecklistIn-ground and above-groundCites the Florida Building Code, Residential, 6th Edition (2017) [2]
Orange CountyResidential Swimming Pool PermitPool, including above-groundCurrent Florida Building Code [7]
GainesvilleResidential Swimming Pool Permit ChecklistPool10-11-2023 [8]
Indian River CountySwimming Pool Permit ChecklistPool, including above-groundUndated [6]
Okaloosa CountyResidential Swimming Pool GuidePoolUndated [1]
Lady LakePool and Hot Tub PermitsAbove-ground poolUndated [9]

The metro pages for Miami, Tampa, Orlando and Jacksonville, and the Florida state page, cover the commercial rules in the same counties.

The setback from pool to property line

Several checklists ask for the distance from the pool to the lot lines, and one sets the figure itself. Okaloosa County requires 5 feet from the edge of the pool water to any side or rear property line [1], so the plan dimensions that setback from the water's edge. Nassau asks for the setback from the pool to each property line [2], and Miami Beach and Hillsborough ask for setbacks on the plan [3, 5].

Above-ground pools

An above-ground pool does not always need a permit. Nassau County requires none when the pool is less than 24 inches deep, holds no more than 5,000 gallons and is installed entirely above ground [2]. Where a permit is needed, Indian River County asks for three legible surveys or site plans showing the distance to the structure [6], and Orange County's residential pool permit covers above-ground pools and takes a site plan or a survey [7]. Orange County also requires digitally signed and sealed plans for a pool entry deck [7]; the deck side of that is on the deck site plans page.

Survey or site plan, and where a seal is required

Florida counties split on what may serve as the base drawing:

JurisdictionWhat it takes
Okaloosa CountyA certified survey or a site plan [1]
Indian River CountyA survey or a plot plan [6]
Orange CountyA site plan or a survey [7]
DavieA signed and sealed survey, provided at its original size and not reduced or enlarged [4]
Miami BeachA "Site Survey Signed & Sealed" (checklist dated 5.23.2024) [3]

Florida pool permits also need engineer-sealed pool drawings, so the site plan is one part of a larger permit package [5, 7]. Plans are preliminary, and engineering is by your engineer of record. Where a sealed survey is required, as in Davie and Miami Beach, a licensed surveyor prepares it [4, 3]; where sealed pool or deck plans are required, the preliminary plan is what the engineer of record builds on. The county-by-county survey question is the subject of the Florida pool permit survey guide, and the wider rules are in where unsealed site plans are accepted.

Pool permits outside Florida

JurisdictionRule
Metro Nashville, TennesseeResidential building permits cover pools, with decks, sheds, garages, carports and additions [10]; residential site plans need not come from a licensed professional but must be accurately dimensioned and drawn to scale [11]
Denver, ColoradoThe residential permitting guide, updated in September 2026, lists swimming pools and hot tubs among the structures in its zoning calculations [12]
Cobb County, GeorgiaBefore a building permit, a current plan and survey of the property sealed by a registered land surveyor (Development Standards s.103.19.1) [13]
Bellevue, WashingtonThe residential site plan is drawn on a sheet of at least 18 x 24 inches, with contour lines for existing and proposed grades at 2-foot intervals on the NAVD 88 datum [14]
Virginia, Chesapeake Bay Preservation Areas2,500 sq ft of land disturbance brings erosion and sediment control and stormwater criteria, against 10,000 sq ft elsewhere (9VAC25-875), and residential permit site plans in Tidewater show the disturbance area [15, 16]

How to order a pool site plan

  1. Open start a project and choose Residential: pool (in-ground or above-ground) as the project type.
  2. Give the city or county and the state, so the plan follows that department's checklist.
  3. Under program and stage, describe the pool: in-ground or above-ground, its size and depth, the deck or patio around it, and where the equipment will sit.
  4. Attach one file, the most useful you have: the survey (signed and sealed, where your county requires one), or a sketch with measurements. If the department publishes a checklist, name it under program and stage.

The studio reads the brief, checks the jurisdiction's rules and replies by email to scope the plan. Related pages: shed site plans, site plan for a permit, how to get a site plan of my property and site plan vs plot plan vs survey. To order the plan for your pool, start a project and choose Residential: pool (in-ground or above-ground).

Frequently asked questions

Do I need a survey for a pool permit in Florida?

It depends on the county. Davie requires a signed and sealed survey [4] and Miami Beach lists a signed and sealed site survey [3]. Okaloosa takes a certified survey or a site plan, Indian River a survey or a plot plan, and Orange County a site plan or a survey [1, 6, 7].

What goes on a pool permit site plan?

Miami Beach's checklist sets the core: setbacks, existing and proposed structures, property lines, lot dimensions and grade elevation as per survey [3]. Nassau adds the location and dimensions of the pool with its setbacks to each property line, easements and overhead or underground power lines [2], and Hillsborough wants conservation and wetland areas identified and a statement that no trees will be removed [5].

How far does a pool have to be from the property line?

Each department sets its own figure. Okaloosa County, Florida sets 5 feet from the edge of the pool water to any side or rear property line [1]. Nassau, Miami Beach and Hillsborough ask for the setbacks to be drawn on the plan [2, 3, 5].

Does an above-ground pool need a permit?

Not always. Nassau County requires none for a pool less than 24 inches deep that holds no more than 5,000 gallons and is installed entirely above ground [2]. Where one is needed, Indian River County asks for three legible surveys or site plans showing the distance to the structure [6].

Who seals the pool drawings?

Florida pool permits need engineer-sealed pool drawings [5, 7], and Orange County requires digitally signed and sealed plans for a pool entry deck [7]. Where a sealed survey is required, as in Davie [4], a licensed surveyor prepares it.

Can I use my mortgage survey for a pool permit?

Where the department accepts it. Metro Nashville says a homeowner's mortgage loan survey works well for a site plan [10]. Davie asks for a signed and sealed survey, provided at its original size and not reduced or enlarged [4].

Sources

  1. 1)Permit Guide for Residential Swimming Pool, Okaloosa County, Florida, Growth Management. Accessed 2026-10-10.
  2. 2)Residential Swimming Pool Plan Review Checklist, Nassau County, Florida, Building Department. Accessed 2026-10-10.
  3. 3)Permit Checklist for Pool, Residential New (5.23.2024), City of Miami Beach, Florida, Building Department. Accessed 2026-10-10.
  4. 4)Residential Pool Checklist, Town of Davie, Florida, Building Division. Accessed 2026-10-10.
  5. 5)Residential Pool Requirements, Hillsborough County, Florida. Accessed 2026-10-10.
  6. 6)Swimming Pool Permit Checklist, Indian River County, Florida, Building Division. Accessed 2026-10-10.
  7. 7)Residential Swimming Pool Permit, Orange County, Florida. Accessed 2026-10-10.
  8. 8)Residential Swimming Pool Permit Checklist (10-11-2023), City of Gainesville, Florida, Building Inspection. Accessed 2026-10-10.
  9. 9)Pool and Hot Tub Permits, Town of Lady Lake, Florida. Accessed 2026-10-10.
  10. 10)Residential Building Permit Procedures, Metropolitan Government of Nashville and Davidson County, Codes Administration. Accessed 2026-10-10.
  11. 11)Residential Permit Procedures (brochure), Metropolitan Government of Nashville and Davidson County, Codes Administration. Accessed 2026-10-10.
  12. 12)Residential Permitting Guide (updated September 3, 2026), City and County of Denver, Community Planning and Development. Accessed 2026-10-10.
  13. 13)2026 Variance Application and Schedule, citing Development Standards s.103.19.1, Cobb County, Georgia. Accessed 2026-10-10.
  14. 14)Residential Site Plan, City of Bellevue, Washington, Development Services. Accessed 2026-10-10.
  15. 15)Virginia Register Vol. 41 Iss. 4 (Fast-Track), 9VAC25-875, Virginia Erosion and Stormwater Management Regulation (October 7, 2024), Commonwealth of Virginia, Virginia Register of Regulations.
  16. 16)Virginia Erosion and Sediment Control Program (revised 4/8/2024), Mecklenburg County, Virginia.

Start a project

Bring us the site. We draw the first plan.

Send the parcel, the program and anything you already have: a survey, a sketch, a zoning letter. The studio returns a preliminary site plan your engineer of record can build on.

Start a project